![Beckman Coulter TQ-Prep Reference Download Page 63](http://html.mh-extra.com/html/beckman-coulter/tq-prep/tq-prep_reference_2719765063.webp)
PN 4237395AA
B-8
OPERATOR CERTIFICATION PROCEDURE
PIPET CALIBRATION PROCEDURE
7
Remove the tip from the deionized or
distilled water while touching the tip to
an inside wall to remove any adhering
liquid.
8
While touching the tip to the tared
weigh boat, slowly dispense the water
by depressing the plunger all the way
down.
9
Record the weight in milligrams on the
Operator Certification form at the end of
this appendix.
Part I - Pipet Precision (Weight of water dispensed)
Type: ____ Air Displacement ____ Positive Displacement
1. __________mg
2. __________mg
3. __________mg
4. __________mg
5. __________mg
1. ____________
2. ____________
3. ____________
4. ____________
1. ____________
mg
2. ____________
mg
3. ____________
mg
4. ____________
mg
COULTER
®
TQ-PREP
™
Workstation Operator Certification Form
100.1
Summary of Contents for TQ-Prep
Page 4: ...PN 4237395AA iv REVISION STATUS ...
Page 8: ...PN 4237395AA viii CONTENTS ...
Page 17: ...PN 4237395AA 1 6 USE AND FUNCTION MATERIAL SAFETY DATA SHEETS MSDS ...
Page 43: ...PN 4237395AA 3 4 OPERATION PRINCIPLES TYPES OF PRIMING ...
Page 47: ...PN 4237395AA 4 4 SPECIFICATIONS CHARACTERISTICS PERFORMANCE CHARACTERISTICS ...
Page 49: ...PN 4237395AA A 2 LOG SHEETS ...
Page 51: ...PN 4237395AA A 4 LOG SHEETS ...
Page 53: ...PN 4237395AA A 6 LOG SHEETS ...
Page 55: ...PN 4237395AA A 8 LOG SHEETS ...
Page 69: ...PN 4237395AA B 14 OPERATOR CERTIFICATION PROCEDURE TQ PREP WORKSTATION PRECISION PROCEDURE ...
Page 71: ...PN 4237395AA B 16 OPERATOR CERTIFICATION PROCEDURE TQ PREP WORKSTATION PRECISION PROCEDURE ...
Page 73: ...PN 4237395AA 2 REFERENCES ...
Page 77: ...PN 4237395AA 4 GLOSSARY ...
Page 85: ......