![Beckman Coulter TQ-Prep Reference Download Page 6](http://html.mh-extra.com/html/beckman-coulter/tq-prep/tq-prep_reference_2719765006.webp)
PN 4237395AA
-vi
CONTENTS
2
INSTALLATION, 2-1
2.1
SPECIAL REQUIREMENTS, 2-1
Space and Accessibility, 2-1
Electrical Input, 2-1
Ambient Temperature and Humidity, 2-1
Ventilation, 2-1
2.2
COULTER REPRESENTATIVE, 2-2
Delivery Inspection, 2-2
Operator Certification, 2-2
2.3
CUSTOMER INSTALLATION, 2-2
Inspecting After Delivery, 2-2
Unpacking and Checking Instrument, 2-3
Connecting the OPTION Reagent Container, 2-6
Connecting the Reagent A, B, and C Containers, 2-9
Connecting the WASTE Container, 2-14
Powering On the Instrument, 2-17
Checking Carousel Alignment, 2-19
Priming and Preparing the Instrument for Use, 2-21
3
OPERATION PRINCIPLES, 3-1
3.1
GENERAL PRINCIPLES, 3-1
3.2
NORMAL SAMPLE FLOW, 3-1
3.3
TYPES OF PRIMING, 3-2
User-Requested, 3-2
New Reagent, 3-3
Automatic, 3-3
Summary of Contents for TQ-Prep
Page 4: ...PN 4237395AA iv REVISION STATUS ...
Page 8: ...PN 4237395AA viii CONTENTS ...
Page 17: ...PN 4237395AA 1 6 USE AND FUNCTION MATERIAL SAFETY DATA SHEETS MSDS ...
Page 43: ...PN 4237395AA 3 4 OPERATION PRINCIPLES TYPES OF PRIMING ...
Page 47: ...PN 4237395AA 4 4 SPECIFICATIONS CHARACTERISTICS PERFORMANCE CHARACTERISTICS ...
Page 49: ...PN 4237395AA A 2 LOG SHEETS ...
Page 51: ...PN 4237395AA A 4 LOG SHEETS ...
Page 53: ...PN 4237395AA A 6 LOG SHEETS ...
Page 55: ...PN 4237395AA A 8 LOG SHEETS ...
Page 69: ...PN 4237395AA B 14 OPERATOR CERTIFICATION PROCEDURE TQ PREP WORKSTATION PRECISION PROCEDURE ...
Page 71: ...PN 4237395AA B 16 OPERATOR CERTIFICATION PROCEDURE TQ PREP WORKSTATION PRECISION PROCEDURE ...
Page 73: ...PN 4237395AA 2 REFERENCES ...
Page 77: ...PN 4237395AA 4 GLOSSARY ...
Page 85: ......