Commissioning
EL34x3
74
Version: 4.4
Fig. 61: Choose target system (remote)
In this sample "Runtime system 1 (port 801)" is selected and confirmed. Link the PLC with the real-time
system via menu option "Online" → "Login", the F11 key or by clicking on the symbol
. The control
program can then be loaded for execution. This results in the message "No program on the controller!
Should the new program be loaded?", which should be acknowledged with "Yes". The runtime environment
is ready for the program start:
Summary of Contents for EL3413-0000
Page 1: ...Documentation EL34x3 3 phase power measurement terminal 4 4 2019 03 28 Version Date ...
Page 2: ......
Page 6: ...Table of contents EL34x3 6 Version 4 4 ...
Page 47: ...Installation EL34x3 47 Version 4 4 Fig 33 Other installation positions ...
Page 91: ...Commissioning EL34x3 91 Version 4 4 Fig 88 Incorrect driver settings for the Ethernet port ...