Table of contents
3.2
Installation of the PC in the control cabinet
17
3.2.1
Preparation of the control cabinet
17
3.2.2
Earthing measures
17
3.3
Power supply of the Industrial PC
18
3.3.1
Current carrying capacity of the 100-240 V power supply unit
18
3.3.2
Mains Socket
18
3.3.3
Power cords Europe
18
3.3.4
Power cords USA / Canada
18
3.4
Connecting the Industrial PC
19
3.4.1
Connecting cables
19
4
Operating Instructions
20
4.1
Switching the Industrial PC on and off
20
4.1.1
Switch on
20
4.1.2
Shutting down and switching off
20
4.1.3
First switching on and driver installation
20
4.2
Servicing and maintenance
21
4.2.1
Cleaning of the Industrial PC
21
4.2.2
Maintenance 21
4.2.3
Replacing the Battery on the Motherboard
21
4.3
Emergency procedures
21
4.4
Shutting down
21
4.4.1
Disposal
21
5
Troubleshooting 22
6
Assembly dimensions
23
7
Technical Data
25
8
Appendix 26
8.1
Beckhoff Support and Service
26
8.1.1
Beckhoff branches and partner companies
26
8.1.2
Beckhoff company headquarters
26
8.2
Approvals for USA and Canada
27
8.3
FCC Approvals for the United States of America
27
8.4
FCC Approval for Canada
27
2
C6670-0010
Summary of Contents for C6670-0010
Page 2: ......