Commissioning
86
───
Version: 2.8
AG2250
9.1
Before operation
Checklist that helps to check important points before starting the op-
eration:
• Inspect the gear unit for damage
• Check mounting and alignment
• Tighten screw connections correctly
• Installing mechanical, thermal and electrical protective devices
9.2
During operation
Checklist that helps to check important points during operation:
• Check function and adjustment of attachments
• Observe information for environment and operation
• Check protective measures against moving and live parts
• Pay attention to unusual noise developments
• Always check gear unit surfaces and lines for dirt, leakages,
moisture or dust
• Check temperature development
• Check for lubricant leakage
• Observe recommended maintenance intervals
• Check function of safety devices
Summary of Contents for AG2250
Page 1: ...Operating instructions EN AG2250 Planetary gear unit 4 13 2022 Version 2 8 ...
Page 2: ......
Page 94: ......