Commissioning
50
───
Version: 1.0
AA3000
10.3
Prerequisites during op-
eration
Pay attention to the following points during operation:
• Listen for atypical noises
• Check for unusual smoke formation
• Always check drive surfaces and cables for dirt, leaks, moisture
or dust
• Check temperature development
• Check for lubricant leakage
• Observe recommended maintenance intervals
• Check function of safety devices
10.4
After operation
WARNING
Place the machine or plant in a safe state
Make sure that the electric cylinder comes to a complete stop.
When the holding brake [+] is released, the spindle moves with-
out remanent torque. Rotating components can lead to serious
injuries.
Summary of Contents for AA3000
Page 1: ...Operating instructions EN AA3000 Electric cylinders 1 17 2022 Version 1 0 ...
Page 2: ......
Page 28: ...Technical data 28 Version 1 0 AA3000 4 3 1Dimensional drawing All figures in millimeters ...
Page 30: ...Technical data 30 Version 1 0 AA3000 4 4 1Dimensional drawing All figures in millimeters ...
Page 32: ...Technical data 32 Version 1 0 AA3000 4 5 1Dimensional drawing All figures in millimeters ...
Page 66: ......