Page 5
4.
Lift up a
Rear Wall (3)
and orientate the wall as shown above. At the bottom,
align wall siding even with outside of the floor. At the top, align wall siding flush
with framing of side wall. When correctly aligned, attach wall frames together
with
3 - 2 1/2” screws (A)
. Screw on a slight angle to penetrate the side wall
framing best.
3.
Lift Side Wall (2)
up and orientate so
wall framing is flush at rear with floor, wall
siding is flush on side with floor. In the front,
wall framing will overhang the floor as
shown below.
You can find the Square Drive
Bit for the screws in with the
Hardware Kit Bag. (Part B)
Front
Front
Rear
Wall Siding flush with
outside for Floor.
3
Wall Siding flush with
outside for Floor
2
3
3
3 - 2 1/2” screws
along wall framing
Call 877.232.7428
www.
bearicuda
.com
info
@
bearicuda
.com