![BEARICUDA 6X3 Canterbury Shed Assembly Manual Download Page 4](http://html.mh-extra.com/html/bearicuda/6x3-canterbury-shed/6x3-canterbury-shed_assembly-manual_2717139004.webp)
Before assembling your
Canterbury
, be
sure to lay down a foundation for your
unit to sit level on.
There are many options such as patio
paving stones, a concrete slab or fine
crushed gravel.
Make sure the area is level and not
elevated with surrounding ground so
garbage cans can move easily in and
out of your
Canterbury
.
36”
76”
Important -
Make sure foundation is level
before moving on to Floor and Wall
Sections. Use a level to confirm.
1.
Locate
Floor (1)
and lay down on level
foundation. Place floor with angle cut
edge to the front. Level floor if required.
2.
Identify all Wall Panels;
2 - Side Wall Arched Panels
(2 & 2A)
Left/Right and
2 - Rear Wall Panels (3 &3A)
Left/Right
If you have space, position
walls around floor leaving
enough room to work. Make
sure walls are correctly
orientated. Avoid positioning
rear walls upside down. Check
orientation with side wall siding
to confirm.
The thick butt of
the siding is down.
1
Front
angle cut edge
to front
2
3
3A
2A
Left
Right
Left
Right
Call 877.232.7428
www.
bearicuda
.com
info
@
bearicuda
.com