background image

Call 877.232.7428           

               www.

bearicuda

.com  

                      

           

info

@

bearicuda

.com

Thank you for purchasing our 6x3 

&DQWHUEXU\

Storage Shed.  Please take the time to identify
all the parts prior to assembly.  

Please use Safety Eyewear and Gloves while
Assembling. Be sure to read and follow all operating
instructions for any tools used during assembly. 
Remember- NO SAW CUTTING IS REQUIRED!

Safety Points and Other Considerations

Our products are built for use based on proper 
installation and normal residential use, on level ground. 
Please follow the instruction manual when building your
Oscar and retain the manual for future maintenance 
purposes.

-Some of the safety and usage measures you may wish
to consider include:
-In high or gusty wind conditions it is 
advisable to keep the structure securely grounded. 
-Have a regular maintenance plan to ensure screws,
doors, roof and parts are tight. 

6X3 

Canterbury

 Shed

Assembly Manual

Page 1

Revision  #7

Jan 1st, 2017

In the event of a missing or broken piece, simply call the 

%HDULFXGD

Customer Support Line @ 1-8

 within 30 days of the delivery of your 

purchase. It is our commitment to you to courier replacement parts, free of charge, 
within 10 business days of this notification. Replacement parts will not be 
provided free of charge after the 30 day grace period. 

6x3 

&DQWHUEXU\

 Dimensions:

Inside - 32” d x 66 3/4” w x 50” (front)  53” (back)
Outside with Lid Overhang

-

37”d x 72 5/8” w x 55”(front) 58” (back) 

Important 

- Inside distance in

front between floor and underside of Front Top Plate = 50” 

- Inside depth when Doors are closed to Rear Wall = 32” 

Please check your garbage can height and depth to confirm they fit prior to purchasing and assembly.

Although not required, having a
helper to assist during a few
assembly steps will make the 
completion of this project more
convenient for you.

Summary of Contents for 6X3 Canterbury Shed

Page 1: ...gular maintenance plan to ensure screws doors roof and parts are tight 6X3 Canterbury Shed Assembly Manual Page 1 Revision 7 Jan 1st 2017 In the event of a missing or broken piece simply call the HDULFXGD Customer Support Line 1 8 within 30 days of the delivery of your purchase It is our commitment to you to courier replacement parts free of charge within 10 business days of this notification Repl...

Page 2: ...m Angle Cut Top 1 2 x 2 1 2 x 54 1 4 12 3 Rear Trim 1 2 x 3 1 2 x 55 Doors 13 2 Doors 32 3 4 x 50 1 2 14 1 Door Flange 1 2 x 3 1 2 x 50 1 2 15 1 Door Stop 1 1 2 x 3 1 2 x 4 12 degree cut on 1 end Hardware Packs 3 Clear Plastic Bags R R1 R2 See Page 3 for illustrated Hardware Details R includes A 2 1 2 Brown Screws 46 B Square Drive Bit 1 C 3 Brown Screws 9 E 2 Black Bolt Head Only with Silver Wash...

Page 3: ...ided Page 3 1 8 Drill Bit 1 1 4 3 Part I Gas Shocks x 2 pc 2 Black 2 Part E x 6 pcs Part L Tee Hinge x 4 pcs Part M Barrel Bolt x 1 pc 3 4 Black Part B Square Drive Bit x 1 pc Part C x 9 pcs Part A x 46 pcs Part H x 16 pcs Black Part J x 28 pcs Part F x 10 pcs Part G x 32 pcs Part O Door Magnet x 1 pc Bent on angle with Screws Part P Lid Magnet x 2 pcs 90 degree bend with Screws Lid Door Part D Bl...

Page 4: ...se a level to confirm 1 Locate Floor 1 and lay down on level foundation Place floor with angle cut edge to the front Level floor if required 2 Identify all Wall Panels 2 Side Wall Arched Panels 2 2A Left Right and 2 Rear Wall Panels 3 3A Left Right If you have space position walls around floor leaving enough room to work Make sure walls are correctly orientated Avoid positioning rear walls upside ...

Page 5: ...rate the side wall framing best 3 Lift Side Wall 2 up and orientate so wall framing is flush at rear with floor wall siding is flush on side with floor In the front wall framing will overhang the floor as shown below You can find the Square Drive Bit for the screws in with the Hardware Kit Bag Part B Front Front R e a r Wall Siding flush with outside for Floor 3 Wall Siding flush with outside for ...

Page 6: ... 3 2 1 2 screws A 6 Lift 2nd Side Wall 2A up and orientate and attach wall to rear wall framing as per Step 3 and 4 3A Wall Siding flush with outside for Floor 3 2 1 2 screws along wall framing 2A 3A 3 2 1 2 screws along wall framing Call 877 232 7428 www bearicuda com info bearicuda com ...

Page 7: ...leat with 1 3 screw per side C Place both Rear Wall Cleats 5 against wall frames and attach each cleat with 6 1 1 4 screws J into wall framing We recommend locating one wall cleat 18 from bottom and the other 18 higher 9 Place Front Top Plate 6 between side walls at top front Side walls will be marked for plate alignment on the inside framing With you helpers holding one end secure opposite end wi...

Page 8: ...s are pre drilled 11 With your helper lift and position the Curved Lid 8 on top of wall framing Center on walls from front to rear and evenly from side to side Evenly spaced from side to side 7 8 F r o n t L id C le a t Lid has pre drilled hole at rear to help identify orientation Call 877 232 7428 www bearicuda com info bearicuda com ...

Page 9: ... inside slide Washer on and tighten Nut snug with 3 8 socket or wrench Complete both sides 13 Complete Strap Hinge attachment using 1 1 Black Screw F and 2 3 4 Black Screws G on the lid side and 2 3 4 Black Screws F on the top wall side and 2 2 Black Screws H on the lower wall side Complete both sides 1 Black Screw F 3 4 Black Screws G 2 Black Screws H Call 877 232 7428 www bearicuda com info bear...

Page 10: ...shock and Lid Some adjustment to height and depth of bottom of shock may be necessary to achieve optimum Lid opening height Gas Shock is shipped with piston extended Piston can only be closed when both Shocks are attached correctly to lid 14 Have your helper hold lid open high enough to desired height while both Gas Shocks I are installed To establish approximate shock position center top shock at...

Page 11: ...rim 12 1 2 x 3 1 2 x 55 Align trims at top of wall panels without impeding the closing of the lid Attach each piece with 6 1 1 2 Finishing Nails K Note Part 12 will cap Part 11 18 Center Rear Trim 12 1 2 x 3 1 2 x 53 on rear wall seam and attach with 6 1 1 2 Finishing Nails K Align to same height and corner rear trims 9 10 Angle cut at top Trim flush with inside of wall framing 11 12 12 Note All T...

Page 12: ...cally so top of door aligns with top of front door corner trim When door is aligned correctly screw hinge into trim with 3 2 Black Screws H Use only 1 screw initially per hinge until both door alignments are confirmed Door Flange 14 attached in Step 22 will cover gap between doors Drill 1 8 pilot holes for 2 screws to prevent wood from splitting Door Trim recessed to center 13 13 E G 20 Line up pr...

Page 13: ... closing door on door stop and mark spot for magnets When satisfied with location secure magnets to door stop and door with hardware found in magnet package 26 To complete position and attach both Lid Magnets P to top of front top plate and to the underside of the lid Start by attaching magnet bracket to inside edge of top plate with magnet screws Close lid and mark location on the underside of th...

Page 14: ...l weather to a silvery gray color If you prefer to keep the cedar lumber looking closer to the original color we suggest that you treat the wood with a good oil base wood stain You may also wish to paint your new shed rather than stain it In both cases we recommend that you consult with a paint and stain dealer in your area for their recommendations Page 14 Call 877 232 7428 www bearicuda com info...

Reviews: