11 / 32
REV. 01
4.2
POSITIONING AND PARTS ASSEMBLY
4.2.1 Arm assembly and peripherals
•
Remove the pallet fixing screws and set the tire changer on the floor.
•
Unscrew the 4 screws from the body, set the vertical arm into the proper seat and fasten the 4
screws firmly with a wrench (Fig. 5/a).
•
This operation must be performed by two operators. A crane or similar equipment may be required
to safely lift the vertical arm.
•
Proceed to screw in the knob that serves as a ‘Stopper” into the base of the
horizont al arm. S wing the horizont al arm from l eft to ri ght back and forth,
adj ust i f necess ar y, the nut as shown in Fig. 5/b.
Before connecting all the power sources ALWAYS check your installations.
They must exactly correspond to those requested by the machine.