background image

35

1

General

1.1

Boiler Description

G 1000 boilers consist of a cast-iron body, 2-stage
atmospheric gas burners and electronic ignition via
intermittent pilot burner. They are available in 5 rated
outputs ranging from 167kW to 348kW.

These boilers are delivered in three packages, which contain:
- one package: assembled boiler body with smoke box and

burner;

- one package: gas train;
- one package: outer casing;
- one package: Control Panel KSF.

1.2  Directives and Standards

These boilers are CE-certified in compliance with the
following European Directives:

- Gas Appliances Directive

90/396/EEC

- Hot Water Boilers Energy Efficiency Directive92/42/EEC
- Electromagnetic Compatibility Directive

89/336/EEC

- Low Voltage Directive

73/23/EEC

These are type B11 boilers intended for use in hot-water
heating systems with a maximum operating temperature of
110ºC and 5 bar pressure.

Both installation and maintenance of the appliance should
be carried out by a qualified professional as directed in
these instructions and according to current regulations.

1.3

Principle of operation

Control cycle

Upon start-up, the 1

st

 solenoid valve of the main gas valve

(1) will open, the ignition electrode (4) will automatically
ignite the pilot burner (2) (intermittent pilot burner), whose
flame, sensed by the flame rod, will remain alight during
commissioning of the main burner (5). All this is monitored
by a control box which signals the main gas valve (3) to
open.

During regulation, the safety devices are self-checked
before ignition of the main burner, with the ignition burner
performing a short stop, then re-starting.

Operation:
- The main valve has a reduced flow-rate (1

st

 stage) which

is factory-set to 60% of the nominal flow.

- The boiler thermostat features two stages (1

st

 stage rated

60%, and 2

nd

 stage rated 100%).

- When the boiler temperature reaches the 2

nd

 stage

setpoint, the main valve switches to 1

st

 stage. If the

temperature reaches the 1

st

 stage setpoint, the thermostat

will switch off the burner.

The boilers are delivered for use with natural gas
G20-20mbar.
For gas changeover, please refer to Section 4.4.

BAXI ROCA certifies that the boilers mentioned in
this instruction manual comply with the essential
requirements of the «Gas Appliances» and «Hot
Water Boilers Energy Efficiency» European
Directives and are therefore permitted to carry the
CE mark.

BAXI ROCA shall not be held responsible for any
damage resulting from operations other than those
contained in this manual or performed by non-
qualified persons.

EN

Gás

03007-00

1

2

4

3

5

ATCROC

Summary of Contents for G 1000-11

Page 1: ...iento para el INSTALADOR 3 ES G 1000 11 G 1000 14 G 1000 17 Caldeiras a gás Instruções de Instalação Montagem e Funcionamento para el INSTALADOR 19 PT G 1000 20 G 1000 22 Gas Boilers Installation Assembly and Operation Instructions for the INSTALLER 35 EN A T C R O C ...

Page 2: ...2 A T C R O C ...

Page 3: ...2 llama piloto intermitente cuya llama detectada por la sonda de ionización permaneceráencendidomientrasdurelapuesta en servicio del quemador principal 5 El conjunto es controladoporunacajadecontrolquedaordendeapertura a la válvula principal 3 Durante la regulación tiene lugar un autocontrol de los elementos de seguridad antes de cada reencendido del quemador principal con breve parada y rearranqu...

Page 4: ...Caudal de los humos en régimen Referencia inyector Ø inyector de llama piloto Ø 0 3 14 5 35 G31 Caudal nominal Qn Presión inyector mbar 1312BS5055 II 2Esi 3P B11 Ø 0 5 21 10 13 16 19 Referencia inyector 6 16 5 320 W Potencia útil nominal Número de elementos Número de quemadores G20 Número de inyectores quemadores Gase natural 20 mbar Ø inyector de llama piloto Caudal m3 h 15 C 1013 mbar Régimen no...

Page 5: ... elementos 11 14 17 20 22 Cotas en mm A 955 1198 1441 1684 1846 B 1144 1194 1244 1294 C 995 1022 1047 1072 D 1005 1015 1175 Ø F exterior 252 302 352 402 Ø Ida Retorno Rp 1 1 2 R 2 DN65 Entrada gas Rp 1 Rp 1 1 2 Rp 2 Multibloc Línea gas ensamblada Cotas en mm E 507 775 875 J 212 229 256 UP à Ut 15 en mbar 100 157 222 210 259 Litros 58 72 85 100 110 Peso 560 703 841 982 1076 N05558 DSF 6 0 6 0 A B 1...

Page 6: ...be estar diseñada para de asegurar en la caldera una circulación de agua para alcanzar un T comprendido entre 10 y 20 K En caso de interrupción brusca de la circulación deagua laaccióndeltermostatodeseguridad provoca la parada total de la caldera y exige un rearme El diseño de la instalación debe pues garantizar una regulación suficientemente progresiva que permita respetar el tiempo de reacción d...

Page 7: ...no debe ser inferior a 0 8 mm c a ni superior a 3 mm c a con la caldera en funcionamiento el conducto de humos debe fijarse cuidadosamente y no debe ser soportado por la caldera Se recomienda utilizar conducto desmontable Esquema de instalación recomendado Cuadro Cálculo de los conductos de humos para conexión de dos calderas idénticas 3 6 Ventilación del local La caldera debe instalarse en un loc...

Page 8: ...laparteinferior dercha vista desbe la parte trasera Conectar obligatoriamente la fase al borne L de la regleta Lalíneadebepodersoportarunaintensidadde6 3Aa230V 50Hz Tierra verificarsilapotencia del los circulador es es son compatible s Efectuar la conexión eléctrica ajustándose al esquema eléctrico de las instrucciones Prever un cable de tierra 50 mm más largo que los cables neutro y fase El inter...

Page 9: ... CL CL CL CL FB BSB MB LPB DB Bus EM Bus BE LPB X60 S3 L1 N L S3 L1 N T1 T2 1 2 N Q3 N Q2 N L T8 T6 T7 Encendido Llama 1 4 3 8 7 5 9 2 1 6 P N 2 1 4 3 6 5 P a Llama 2a L1 N L1 N L1 T1 N T3 T2 L1 L2 N Encendido Llama 1 4 3 8 7 5 9 2 1 6 P N a Llama 2a L1 T1 N T3 T2 L2 L1 N 3 9 Esquemas electricos de connexionado de la caldera 11 14 17 20 22 con cuadro KSF ZSB Rearme bloqueo quemador Regulador de ca...

Page 10: ...rnillos M5 a los laterales D Colocar los 3 aislantes alrededor del cortatiro y fijarlos con los 4 muelles de horquilla suministrados dentro de la bolsa tornillería 2 A Premontar los tornillos M 5 sobre los laterales izquierdo y derecho sin apretarloscompletamente Introducir los 2 tornillos M5 y los pivotes inferiores en los orificios laterales de la carcasa que contiene la caja de control B Apreta...

Page 11: ...quierda 4 A Desenroscar los 4 tornillos situados en los soportes del cuadro de contol Posiciónar el cuadro y pasar los sensores a través de la apertura prevista Reemplace los 4 tornillos para fijar el cuadro al envolvente B Hacer pasar los cables y sondas dentro de la carcassa e introducir los bulbos en el vaina a la derecha o a la izquierda según la posición del cuadro de control C Fijar la placa...

Page 12: ...tapa frontal sobre los tornillos pivotes y enganchar la cadenilla en el orificio situado bajo el cierre cuarto de vuelta C Bloquear la tapa frontal con los cierres un cuarto de vuelta D Deslizar la tapa superior trasera hacia adelante y bloquearla con las patillas de retención 5 D B C A Tornillos cuarto de vuelta Tornillospivotes Cadenilla A T C R O C ...

Page 13: ...montaje de los bulbos de los termostatos y termómetro en el vaina tal como se indica en el esquema inferior Conexión válvulas Bulbos de los termostatos de regulación Válvulas conector 9 vías Presostato gas opcional conector 6 vías Bujía de encendido Sonda de ionización Vaina N05573 ES PT EN DSF En el montaje de los capilares procurar colocarlos haciendo tope al fondo del vaina 1 Termostato de segu...

Page 14: ...n del caudal girando a la izquierda aumento del caudal Ajustar así la presión reducida en los inyectores al valor indicado ver cuadro de características de gases en la página 4 4 2 Conjunto línea gas quemador Elconjuntolíneagas quemadorseregula enfábricaalapresión decaudalnominalyreducido vercaracterísticasgaspágina4 Si es necesaria una modificación de la presión en los inyectores proceder de la m...

Page 15: ...aje régimen REDUCIDO y control de la presión en los inyectores bajareltermostatodobleetapademaneraquesóloquede el 1a etapa en demanda aflojar el tornillo de bloqueo M una vuelta girar el volante dentado N en el sentido ó según la necesidad regular la presión reducida en los inyectores al valor delgasindicado vercuadrodecaracterísticasdegases apretar el tornillo M de bloqueo B J N I M K E 4 3 Puest...

Page 16: ...tar el quemador limpiar el paso de humos 6 230 V 50 Hz B D E A B D E C 03639 dsf Electrodo de tierra Electrodo de encendido Sonda de ionización Vista de arriba 5 Mantenimiento Las condiciones de garantía requieren que el funcionamiento el mantenimiento preventivo y correctivo de la caldera sean realizados correctamente Un mantenimiento regular realizado por profesionales garantizará un funcionamie...

Page 17: ...conductos Colocar la tapa de la caja de humos y verificar la estanqueidad Colocar la tapa superior Después de estas operaciones desmonyaje quemador y limpezia Verificar la estanqueidad del circuito de gas y el funcionamiento correcto encendido llama piloto elementos de regulación efectuar un control general de la caldera fijación estanqueidad funcionamiento correcto de la línea de gas y funcionami...

Page 18: ...cia de chispa pero no hay verificar que la alimentación de gas está abierta llama en piloto intermitente verificar la presión gas en la toma circuito de la válvula verificar que el tubo de gas llama piloto está purgado verificar el inyector de la llama piloto verificar la posición del electrodo de encendido en relación al cabezal del quemador de encendido para rearrancar presionar el botón de rear...

Page 19: ...to 4 acende automaticamente o queimador piloto 2 chama piloto intermitente cuja chama detectada pela sonda de ionização permanecerá acesa enquanto estiver em serviço o queimador principal 5 O conjunto é controlado por uma caixa de controlo que dá ordem de abertura à válvula principal 3 Durante a regulação tem lugar um auto controlo aos elementos de segurança antes de cada reacendimento do queimado...

Page 20: ...umos B11 1312BS5055 Categoria II 2Esi 3P 10 13 16 Gasto calorífico nominal Potancia útil nominal Número de elementos Gasto calorífico 1a etapa 60 Número de inyectores queimadores 19 21 Gase natural 20 mbar Ø injector de chama piloto Ø 0 5 G20 Caudal m3 h 15 C 1013 mbar Gasto nominal Qn 19 Número de queimadores 24 8 30 5 36 2 40 Pressão injector mbar 6 16 5 14 5 35 Ref injector 320 W Temperatura do...

Page 21: ...402 Ø ida retorno Rp 1 1 2 R 2 DN65 H para 37 mbar Rp 1 Rp 1 1 2 Rp 2 Multibloco Linha de gás ligada E 507 775 875 J 212 229 256 E 429 J 212 UP a Ut 15 en mbar 100 157 222 210 259 Litros 58 72 85 100 110 Peso 560 703 841 982 1076 R Rosca exterior cónica Rp Rosca interior cilíndrica Pressão de serviço 5 bar Alimentação eléctrica 230 V 50 Hz Temperatura de utilização máx 90 C N05558 DSF 6 0 6 0 A B ...

Page 22: ...ve estar desenhada de forma a assegurar na caldeira uma circulação de água para atingir um T compreendido entre os 10 e os 20º C Nocasodeumainterrupçãobruscadacirculação de água o termóstato de segurança actua provocando a paragem total da caldeira exigindo um rearme O desenho da instalação deve pois garantir uma regulação suficientemente progressiva de modo apermitirrespeitarotempodereacçãodoster...

Page 23: ...o A conduta de fumos deve fixar se cuidadosamente e não deve ser suportada pela caldeira Recomenda se a utilização de uma conduta desmontável 1 metro mínimo recomendado A posição para a medição da tiragem é igual ao Ø da chaminé Esquema de instalação recomendado Cuadro Cálculo das conductas de fumos para ligação de duas calderais idênticas 3 6 Ventilação do local A caldeira deve ser instalada num ...

Page 24: ... que os cabos neutro e fase Ointerruptordoquadrodecontrolonãoeximedointerruptor geral exigido na normativa No caso da corrente de ionização ser insuficiente por razões de neutro ou terra não conformes recomenda se juntar um transformador de isolamento do circuito de potência com pelo menos 600VA A tomada de terra prevista na régua dos bornes de ligação deve ligar se de acordo com as prescrições em...

Page 25: ...L CL CL FB BSB MB LPB DB Bus EM Bus BE LPB X60 S3 L1 N L S3 L1 N T1 T2 1 2 N Q3 N Q2 N L T8 T6 T7 4 3 8 7 5 9 2 1 6 P N 2 1 4 3 6 5 P L1 N L1 N L1 T1 N T3 T2 L1 L2 N 4 3 8 7 5 9 2 1 6 P N L1 T1 N T3 T2 L2 L1 N Arranque Escalão 1o Escalão 2o Arranque Escalão 1o Escalão 2o 3 9 Esquemas eléctricos de ligação de la caldeira 11 14 17 20 22 com o quadro KSF ZSB Rearmede bloqueiodo queimador Controlo de ...

Page 26: ...m 2 parafusos M5 D Colocar os 3 isolantes em volta do cortatiro e fixá los com as 4 molas de forquilha fornecidas no saco com parafusos 2 A Pré montarosparafusosM5sobre os laterais esquerdo e direito sem os apertarcompletamente Introduzir os 2 parafusos M5 e os pivôs inferioresnosorifícioslateraisdacarcaça que contém a caixa de controlo B Apertarcomfirmezaos2parafusos M5 A 1 B 2 B N03961 DSF N0396...

Page 27: ...ta ou à esquerda 4 A Desaperte os 4 parafusos localizados sobre os suportes de montagem do quadro de controlo Posicionar o quadro e passar os sensores através da abertura prevista Repor os 4 parafusos para bloquear o quadro na envolvente B Passar os cabos e as sondas dentrodacarcaçaeintroduzirosbulbos na bainha à direita ou à esquerda conforme a posição do quadro de controlo C Fixar a placa fronta...

Page 28: ...xaratampafrontalsobreos parafusospivôseengancharacorrente no orifício localizado sob o fecho de um quartodevolta C Bloquear a tampa frontal com os fechos de um quarto de volta D Deslizaratampasuperiortraseira para a frente e bloqueá la com as patilhas de retenção Fechos de quarto de volta 5 D B C A Parafusos pivôs Corrente A T C R O C ...

Page 29: ...tagem dos bolbos dos termóstatos e do termómetro na bainha tal como o esquema inferior indica Ligação das válvulas Bulbos dos termóstatos de regulação Válvulas conector 9 vias Presostato a gás conector 6 vias Eléctrodo de acendimento Sonda de ionização Bainha N05573 ES PT EN DSF Na montagem dos capilares procurar colocá los do modo a que toquem o fundo da bainha 1 Termóstato de segurança 2 Termóme...

Page 30: ...nto certificando se de que o termóstato de dupla etapa está a pedir calor com o fim de abrir as duas válvulas do multibloco A regulação do regime NOMINAL efectua se com o parafuso a do regulador de pressão Regular ao valor do gás requerido ver características do gás página 18 Atenção O volante regulação do caudal NOMINAL b deve estar sempre na posição de abertura máxima se necessário aliviar o par...

Page 31: ... regime REDUZIDO e controlo da pressão nos injectores Descer o termóstato de dupla etapa de modo a que só fique a 1ª etapa em pedido Aliviar o parafuso de bloqueio M uma volta Rodar o volante dentado N no sentido ou conforme o necessário Regular a pressão reduzida nos injectores ao valor do gásindicado veroquadrodecaracterísticasdosgases Apertar o parafuso M de bloqueio 4 3 Arrenque da caldeira Co...

Page 32: ...im como o incumprimento destas instruções 5 1 Desmontagem do queimador 6 Desligar da corrente eléctrica Fechar a torneira de gás Retirar a porta A Retirar os conectores por baixo da carcaça e do quadro de controlo B Desmontaralinhadegás atenção à junta plana C Retirar a chapa de fundo D Desaparafusarasporcasdaplaca do queimador E Puxar para si o conjunto queimador horizontalmente Verificar o estad...

Page 33: ... eixo das condutas Colocar a tampa da caixa de fumos e verificar a estanquecidade Colocar a tampa superior Após estas operações desmontagem do queimador e limpeza Verificar a estanquidade do circuito de gás e o correcto funcionamento acendimento chama piloto elementos de regulação Efectuar um controlo geral da caldeira fixação estanquidade correcto funcionamento da linha de gás e o funcionamento d...

Page 34: ...Verificar que a alimentação de gás está aberta há chama piloto intermitente Verificar a pressão do gás na tomada do circuito da válvula Verificar que o tubo de gás da chama piloto está purgado Verificar o injector da chama piloto Verificar a posição do eléctrodo de acendimento em relação ao cabeçal do queimador de acendimento Para rearrancar pressionar o botão de rearme A chama no queimador de Ver...

Page 35: ... electrode 4 will automatically ignite the pilot burner 2 intermittent pilot burner whose flame sensed by the flame rod will remain alight during commissioning of the main burner 5 All this is monitored by a control box which signals the main gas valve 3 to open During regulation the safety devices are self checked before ignition of the main burner with the ignition burner performing a short stop...

Page 36: ... type B11 Nominal heat input Appliance category 1st stage heat input 60 Rated heat output Number of sections Number of burners 10 13 16 19 21 Number of burner injectors Gase natural 20 mbar Ø of pilot flame injector Ø 0 5 G20 Flow rate m3 h 15 C 1013 mbar Nominal flow rate Qn 19 24 8 30 5 36 2 40 Burner setting pressure mbar 6 16 5 14 5 Injector type 320 W Flue gas temperature Flue gas flow rate a...

Page 37: ...A 955 1198 1441 1684 1846 B 1144 1194 1244 1294 C 995 1022 1047 1072 D 1005 1015 1175 Ø F OD 252 302 352 402 Ø return flow Rp 1 1 2 R 2 R 2 DN65 Gas inlet Rp 1 Rp 1 1 2 Rp 1 1 2 Rp 2 Multibloc Assembled gas train Dimensions in mm E 507 775 875 J 212 229 256 UP at Ut 15 in mbar 100 157 222 210 259 Litres 58 72 85 100 110 Weight 560 703 841 982 1076 N03970en_ro TBL N05558 DSF 6 0 6 0 A B 131 1052 15...

Page 38: ...P THE BOILER Thesystemmustbedesignedtoensureawaterflowacross the boiler in order to reach a T between 10ºC and 20ºC Shouldthewaterstopflowingallofasudden the limit thermostat will cause the boiler to shut down requiring manual reset The system design should therefore assure a sufficientlygradualregulationastosatisfytheresponse time of thermostats 3 Installation 3 1 Installating the boiler G 1000 b...

Page 39: ...ust not be supported by the boiler It is advisable to fit a removable type flue system 1 metre minimum recommended The distance for measuring the cheminey pull is equal to the Ø of the cheminey Recommended system diagram Table calculation of flue ducts for connecting two identical boilers 3 6 Room ventilation The boiler should be installed in a room separate from living quarters with direct ventil...

Page 40: ...made for the Earth wire to be 50 mm longer than the Neutral and Live wires The control panel switch does not dispense with the need for the main On Off regulatory switch Shouldtherenotbeenoughionizationcurrentduetodefective neutralorearth itisadvisabletoaddanisolationtransformer for the power circuit rated for 600VA minimum The earth connection on the terminal strip must be wired according to curr...

Page 41: ...2 3 1 2 CL CL CL CL FB BSB MB LPB DB Bus EM Bus BE LPB X60 S3 L1 N L S3 L1 N T1 T2 1 2 N Q3 N Q2 N L T8 T6 T7 4 3 8 7 5 9 2 1 6 P N 2 1 4 3 6 5 P L1 N L1 N L1 T1 N T3 T2 L1 L2 N 4 3 8 7 5 9 2 1 6 P N L1 T1 N T3 T2 L2 L1 N Flame Start 1st Stage 2st Stage 2nd Stage Flame Start 1st Stage ZSB Reset burner lockout Boiler control RVS 43 222 100 Version 14 17 20 22 Version 11 Adaptation wiring kit for ga...

Page 42: ...d fasten it to the side casing panels using 2 M5 screws D Putthe3thermicinsulantondraft diverter and fix its with the 4 pins supply in screw bag 2 A Lead the M5 screws into the right and left side casing panels but do not tighten them Insert the 2 M5 screws and the bottom locating pins in the slots in the casing that contains the control box B Tighten the 2 M5 screws firmly Slots Pins A 1 B 2 B N0...

Page 43: ...he 4 screws located on the mounting brackets beneath the control panel Position the control panel on top of the casing and pass the sensor cables through the opening Replace the 4 screws to anchor the control panel to the casing B Route the cables and sensors into the control box and insert the bulbs in their pockets on the right or left according to the position of the control panel C Securethefr...

Page 44: ...Fit the pin screws B Fitthefrontcoveronthepinscrews and hook the chain in the hole located under the 1 4 turn lock C Lock the front cover in position using the 1 4 turn locks D Slide the top rear cover forward and lock it with the retaining latches 5 D B C A Pins screw Chain 1 4 turn locks A T C R O C ...

Page 45: ...sertthethermostatandthermometerbulbsinthepocket as shown in the diagram below Valves connection Control thermostat bulbs Valves 9 way connector Optional gas pressure s witch 6 way connector Ignition plug Flame sensing rod Pocket N05573 ES PT EN DSF When fitting the capillaries ensure they are inserted fully in the glove finger 1 Overheating safety thermostat 2 Heating outlet thermometer 3 Regulati...

Page 46: ... is on demand so that both valves on the Multibloc will open SettingtheNOMINALoperatingconditionsisdonethrough the adjustment screw a on the pressure regulator Set the value according to the type of gas to be used see gas characteristics on page 33 Caution Knob b for setting the NOMINAL flow rate should alwaysbesettothemaximumopeningposition ifrequired loosen screw c and turn the knob towards the ...

Page 47: ...gh the test point on the gas manifold The required pressure will be obtained by turning ring J towards the or sign as the case may be SettingtheREDUCEDoperatingconditionsandburner setting pressure control Lowerthetwo stagethermostatsettingsothatonlythe1st stage remains on demand Loosen locking screw M one turn Turn the notched ring N towards the or sign as required Adjust the reduced pressure at t...

Page 48: ...o the gasket C Remove the bottom plate D Unscrew the burner plate nuts E Pull the burner assembly horizontally Check the condition of the burner s surface clean the burner Check the position and condition of the electrodes see drawing Before refitting the burner clean the flue 5 2 Cleaning It is advisable to clean the flue at least once a year 6 230 V 50 Hz B D E A B D E C 03639 dsf Top view Clean...

Page 49: ... Replacethesmokeboxcoverandcheck it for tightness Refit the top panel Once these operations removing the burner and cleaning have been completed Check the gas circuit for leaks and correct operation ignition pilot flame controls Carry out a general check of the boiler fixing leak tightness correct operation of the gas train and thermostats A T C R O C ...

Page 50: ...r Spark presence but no flame in the Check that the gas supply cock is open intermittent pilot burner Check the gas pressure at the valve circuit test point Check that the pilot burner gas tube has been vented Check the pilot burner injector Check the position of the ignition electrode in relation to the ignition burner head To restart the boiler press the reset button Flame present on ignition bu...

Page 51: ...51 A T C R O C ...

Page 52: ...e Llobregat 2007 réf RO 1313 I 7 ES PT EN 09 11 A B A X I G R O U P z z z z z Baxi Calefacción S L U Salvador Espriu 9 I 08908 L Hospitalet de Llobregat I Barcelona T 93 263 0009 I TF 93 263 4633 I www baxicalefaccion com company A T C R O C ...

Reviews: