43
3
Fit the junction box before the
top front casing panel
A
Insert the pins into the slots.
B
Fasten it through the lower part,
using the M5 screw.
C
Check that the 3-way connector
& jumper are in place.
D
Fit the top front casing panel by
positioning the opening for the control
box on the right or left, using the 2 M5
screws.
The control panel must always
be fitted on the heating flow and gas
inlet side.
Pieces of equipment to be
located according to right or left-hand
arrangement
4
A
Unscrew the 4 screws located on
the mounting brackets beneath the
control panel. Position the control panel
on top of the casing and pass the sensor
cables through the opening. Replace the
4 screws to anchor the control panel to
the casing.
B
Route the cables and sensors
into the control box and insert the bulbs
in their pockets on the right or left
according to the position of the control
panel.
C
Secure the front control box casing
panel using an M5 screw.
3
z
B
N03969.DSF
A
Pins
Slots
C
N03962.DSF
D
Location of pockets
and sensors for this
arrangement
Arrangement
Left-hand
or
Right-hand
Sensor
wiring
4
Location of pockets
and sensors for this
arrangement
N05562.DSF
z
z
z
z
z
z
z
z
z
z
B
A
C
ATCROC
Summary of Contents for G 1000-11
Page 2: ...2 A T C R O C ...
Page 51: ...51 A T C R O C ...