Function
Prog.
no.
Level
1)
Standard value
Consumer circuit 2
Flow temp setp cons request
1909
C
70°C
DHW charging priority
No | Yes
1924
E
Yes
Excess heat draw
Off | On
1925
E
ON
With buffer storage tank
No | Yes
1928
E
Yes
With prim contr/system pump
No | Yes
1930
E
Yes
Swimming pool circuit
Flow temperature setpoint
1959
C
70°C
DHW charging priority
No | Yes
1974
E
Yes
Excess heat draw
Off | On
1975
E
On
With buffer storage tank
No | Yes
1978
E
Yes
With prim contr/system pump
No | Yes
1980
E
Yes
Swimming pool
Setpoint solar heating
2055
Eu
26°C
Setpoint source heating
2056
Eu
22°C
Charging priority solar
Priority 1 | Priority 2 | Priority 3
2065
E
Priority 3:
Swimming pool temp max
2070
E
32°C
With solar integration
No | Yes
2080
E
Yes
Primary contr/system pump
Flow temp setpoint min
2110
E
8°C
Flow temp setpoint max
2111
E
80°C
Syst pump on heat gen lock
Off | On
2121
E
Off
Mixing valve boost
2130
E
0°C
Actuator running time
2134
E
120 s
Primary contr/system pump
Before buffer | After buffer
2150
E
After buffer
Primary contr/system pump
Before buffer | After buffer
2150
E
After buffer
Primary contr/system pump
Before buffer | After buffer
2150
E
After buffer
Primary contr/system pump
Before buffer | After buffer
2150
E
After buffer
Boiler
Release below outside temp
2203
E
- - -°C
Programming
6
7
Summary of Contents for POWER HT-A 1.430
Page 1: ... 1 QVWDOODWLRQ PDQXDO DV FRQGHQVLQJ ERLOHUV 3RZHU 7 ...
Page 8: ......
Page 13: ...3 4 Wiring diagram Fig 3 Wiring diagram Technical Data 3 1 ...
Page 41: ...Connection diagram Prior to installation 1 4 ...
Page 43: ...Connection diagram Prior to installation 3 4 ...
Page 45: ...Connection diagram Prior to installation 5 4 ...
Page 47: ...Wiring plan right POWER HT A Prior to installation 47 ...
Page 48: ...Wiring plan left POWER HT A Prior to installation 48 ...
Page 49: ...4 17 Legend Prior to installation 9 4 ...
Page 161: ...Space for notes 1 6 1 ...
Page 162: ...Space for notes 2 6 1 ...
Page 163: ...Space for notes 3 6 1 ...
Page 164: ......