8.0 Installation
18
8.1
Initial Preparation & Fitting the Boiler
The gas supply, gas type and pressure must be
checked for suitability before connection (see
Section 7.6).
1. Locate the wall template (Fig. 21) in the
appliance packaging.
2. After considering the site requirements
(see Section 7.0) position the template on the wall
ensuring it is level both horizontally and vertically.
3. Select the six most suitable fixing holes and
mark their position.
4. Mark the centre of the flue hole (rear exit). For
side exit, mark as shown. If required, mark the
position of the gas and water pipes. Remove the
template.
5. Cut the hole for the flue (minimum diameter
107mm).
6. Drill and plug the mounting bracket fixing holes.
7. Using the screws and washers provided, secure
the mounting bracket to the wall.
8. Lift the boiler and locate the slots in the upper
chassis over the hooks on the mounting bracket
(Fig. 22).
THIS OPERATION WILL REQUIRE
ASSISTANCE !
9. Remove the sealing plugs from the gas and
water connections.
10. Connect the gas and water valves together with
the appropriate copper tail ensuring that the sealing
washers are correctly fitted.
NOTE:
The rubber gas sealing washers are an
integral part of the gas valve.
8.2
Flushing
1. Thoroughly flush the system - see Section 6.2.
Maxflow Combi WM
FIXING TEMPLATE
Gas Inlet
Safety Valve
Mounting Hooks
Mounting Bracket
Mounting Slots
Heating Flow
Heating Return
Cold Water Inlet
Hot Water Outlet
General Area For
Electrical Supply
Appliance Outline
107mm Dia Minimum
Aperture For Flue Tube
Mounting Bracket
160mm
For Side Flue Exit
Fig. 21
Fig. 22