6.0 System Details
11
6.5
System Filling and Pressurising
1. A filling point connection on the central heating
return pipework must be provided to facilitate
initial filling and pressurising and also any
subsequent water loss replacement/refilling.
2. The filling method adopted must be in
accordance with all relevant water supply bye-
laws and use approved equipment.
3. Your attention is drawn to: IRN 302 and Byelaw
14.
4. The sealed primary circuits may be filled or
replenished by means of a temporary connection
between the circuit and a supply pipe, provided a
‘Listed’ double check valve or some other no less
effective backflow prevention device is
permanently connected at the inlet to the circuit
and the temporary connection is removed after
use (Fig. 6).
6.6
Expansion Vessel
(Fig. 7)
(Central Heating only)
1. The appliance expansion vessel is pre-charged
to 0.8 bar. Therefore, the cold fill pressure is 0.8
bar. The vessel is suitable for correct operation for
system capacities up to 125 litres (27.5gal). For
greater system capacities an additional expansion
vessel must be fitted - refer to BS 7074 Pt 1.
6.7
Pressure Relief Valve
(Fig. 8)
1. The pressure relief valve is set at 3 bar,
therefore all pipework, fittings, etc. should be
suitable for pressures in excess of 3 bar.
2. The pressure relief discharge pipe should be
not less than 15mm dia, run continuously
downward, and discharge outside the building,
preferably over a drain. It should be routed in such
a manner that no hazard occurs to occupants or
causes damage to wiring or electrical
components. The end of the pipe should terminate
facing down and towards the wall (Fig. 9).
3. The discharge must not be above a window,
entrance or other public access. Consideration
must be given to the possibility that boiling
water/steam could discharge from the pipe.
Fig. 6
Fig. 7
Fig. 8
Fig. 9
Stop Valve
Double
Check
Valve
DHW
Mains
Inlet
CH
Return
Temporary
Hose
Discharge Pipe
Pressure Relief Valve
Expansion Vessel