![Baxi EcoBlue 12 System ErP Installation And Service Manual Download Page 75](http://html1.mh-extra.com/html/baxi/ecoblue-12-system-erp/ecoblue-12-system-erp_installation-and-service-manual_2711775075.webp)
75
www
.
centra
l
heating
.
co
.
uk
I
t
i
s
recommended
that
your
heat
i
ng
system
i
s
serv
i
ced
regu
l
ar
l
y
and
that
the
appropr
i
ate
Serv
i
ce
I
nterva
l
Record
i
s
comp
l
eted.
Serv
i
ce
Prov
i
der
Before
comp
l
eting
the
appropriate
Service
Record
be
l
ow,
p
l
ease
ensure
you
have
carried
out
the
service
as
described
in
the
manufacturer’s
instructions
.
SERV
I
CE
RECORD
SERV
I
CE
01
Date:
Engineer
name:
Company
name:
Te
l
ephone
No:
Gas
safe
register
No:
Record:
At
max
.
rate:
CO
ppm
AND
CO
² %
At
min
.
rate:
(Where
Possib
l
e)
CO
ppm
AND
CO
² %
Comments:
Signature
SERV
I
CE
02
Date:
Engineer
name:
Company
name:
Te
l
ephone
No:
Gas
safe
register
No:
Record:
At
max
.
rate:
CO
ppm
AND
CO
² %
At
min
.
rate:
(Where
Possib
l
e)
CO
ppm
AND
CO
² %
Comments:
Signature
SERV
I
CE
03
Date:
Engineer
name:
Company
name:
Te
l
ephone
No:
Gas
safe
register
No:
Record:
At
max
.
rate:
CO
ppm
AND
CO
² %
At
min
.
rate:
(Where
Possib
l
e)
CO
ppm
AND
CO
² %
Comments:
Signature
SERV
I
CE
04
Date:
Engineer
name:
Company
name:
Te
l
ephone
No:
Gas
safe
register
No:
Record:
At
max
.
rate:
CO
ppm
AND
CO
² %
At
min
.
rate:
(Where
Possib
l
e)
CO
ppm
AND
CO
² %
Comments:
Signature
SERV
I
CE
05
Date:
Engineer
name:
Company
name:
Te
l
ephone
No:
Gas
safe
register
No:
Record:
At
max
.
rate:
CO
ppm
AND
CO
² %
At
min
.
rate:
(Where
Possib
l
e)
CO
ppm
AND
CO
² %
Comments:
Signature
SERV
I
CE
06
Date:
Engineer
name:
Company
name:
Te
l
ephone
No:
Gas
safe
register
No:
Record:
At
max
.
rate:
CO
ppm
AND
CO
² %
At
min
.
rate:
(Where
Possib
l
e)
CO
ppm
AND
CO
² %
Comments:
Signature
SERV
I
CE
07
Date:
Engineer
name:
Company
name:
Te
l
ephone
No:
Gas
safe
register
No:
Record:
At
max
.
rate:
CO
ppm
AND
CO
² %
At
min
.
rate:
(Where
Possib
l
e)
CO
ppm
AND
CO
² %
Comments:
Signature
SERV
I
CE
08
Date:
Engineer
name:
Company
name:
Te
l
ephone
No:
Gas
safe
register
No:
Record:
At
max
.
rate:
CO
ppm
AND
CO
² %
At
min
.
rate:
(Where
Possib
l
e)
CO
ppm
AND
CO
² %
Comments:
Signature
SERV
I
CE
09
Date:
Engineer
name:
Company
name:
Te
l
ephone
No:
Gas
safe
register
No:
Record:
At
max
.
rate:
CO
ppm
AND
CO
² %
At
min
.
rate:
(Where
Possib
l
e)
CO
ppm
AND
CO
² %
Comments:
Signature
SERV
I
CE
10
Date:
Engineer
name:
Company
name:
Te
l
ephone
No:
Gas
safe
register
No:
Record:
At
max
.
rate:
CO
ppm
AND
CO
² %
At
min
.
rate:
(Where
Possib
l
e)
CO
ppm
AND
CO
² %
Comments:
Signature
*A
ll
insta
ll
ations in Eng
l
and and Wa
l
es must be
to Loca
l
Authority Bui
l
ding Contro
l
(LABC) either direct
l
y or through a
Competent Persons Scheme
.
A Bui
l
ding Regu
l
ations Comp
l
iance
wi
ll
then be issued to the customer
.
©
Heating
and
Hotwater
I
ndustry
Counci
l
(HH
I
C)