![Baxi EcoBlue 12 System ErP Installation And Service Manual Download Page 69](http://html1.mh-extra.com/html/baxi/ecoblue-12-system-erp/ecoblue-12-system-erp_installation-and-service-manual_2711775069.webp)
7219708 - 01 (04/15)
EcoBlue System
69
Decommissioning
12
12
Decommissioning
12.1 Decommissioning Procedure
1. Disconnect the gas & electric supplies and isolate them.
2. Drain the primary circuit and disconnect the filling device.
3 . Dismantle the chimney system and remove the boiler from the
wall mounting frame.