![Baxi Bermuda SP3 Installation And Servicing Manual Download Page 8](http://html.mh-extra.com/html/baxi/bermuda-sp3/bermuda-sp3_installation-and-servicing-manual_2711686008.webp)
Supplied By www.heating spares.co Tel. 0161 620 6677
Initial Preparation
Unpack the fire unit by removing the polystyrene
packing piece complete with fitments and placing to
one side, then lift the fire from its box.
Electrical Connections
Electricity is supplied to the fire unit via the plug-and-
cable assembly provided with the appliance.
The cable must be connected to the plug and socket
on the boiler base. This connection should be made at
the same time as the boiler electrical connections.
NOTE: The method of connection to the electricity
supply must facilitate complete electrical isolation
of the appliance. Connection may be made via a
fused double pole isolator with a contact
separation of at least 3mm (
1
/
8
in) in all poles
and serving the appliance and systems control
only (max. fuse rating 3 amp). A permanent
electricity supply to the boiler is required.
WARNING
THIS APPLIANCE MUST BE EARTHED. 4 core
input cable for connection to the boiler unit must
NOT be less than 0.75mm
2
(24 x 0.2mm) PVC heat
resistant to 70
°
C grade 1 to BS 6500 table 15 or 16.
E
E
br
b
b
b
b
b
b
br
b
b
L
N
E
L
N
br
br
br
br
br
br
br
Micro-Switch
Micro-Switch
Resistor
Resistor
Plug and
Socket - 3 pin
KEY
br - Brown
b - Blue
Bulb
Bulbs
Switch
Switch
Spark Generator
Spark Generator
Functional Flow Diagram
Electrode
Electrode
Plug
Bulb
INSTALLATION
8