![Baxi Bermuda SP3 Installation And Servicing Manual Download Page 6](http://html.mh-extra.com/html/baxi/bermuda-sp3/bermuda-sp3_installation-and-servicing-manual_2711686006.webp)
Supplied By www.heating spares.co Tel. 0161 620 6677
Bermuda VP3 (Natural Gas)
Heat Input
(Gross)
High
Med-High
kW
5.74
4.95
Btu/h
19,600
16,900
Heat Input
(Gross)
Med
Low
kW
3.43
2.07
Btu/h
11,700
7,100
Setting Pressure
Cold
mbar
12.8 + 0.5
in wg
5.12 + 0.2
Gas Connection
The gas supply is
provided from the
service cock on the
boiler unit.
Electricity Supply
230V~50Hz 3A 120W
External fuse - 3A
Controls
Rotary gas tap with
Atmospheric sensing device.
Electronic ignition.
Lifting Weight
27.5 kg (60.6 lbs)
Thermocouple
9.4 - 13mV
Output
Gas Rate
0.57m
3
/h
(after 10 mins)
(20.19ft
3
/h)
Outercase
Height
689mm
Dimensions
Width
703mm
Depth
337mm
Heat Output
High
kW
3.52
Btu/h
12,000
Heat Input
(Gross)
High
Med-High
kW
5.74
4.95
Btu/h
19,600
16,900
Heat Input
(Gross)
Med
Low
kW
3.43
2.07
Btu/h
11,700
7,100
Setting Pressure
Cold
mbar
12.8 + 0.5
in wg
5.12 + 0.2
Gas Connection
The gas supply is
provided from the
service cock on the
boiler unit.
Electricity Supply
230V~50Hz 3A 120W
External fuse - 3A
Controls
Rotary gas tap with
Atmospheric sensing device.
Electronic ignition.
Lifting Weight
27.5 kg (60.6 lbs)
Thermocouple
9.4 - 13mV
Output
Gas Rate
0.57m
3
/h
(after 10 mins)
(20.19ft
3
/h)
Outercase
Height
689mm
Dimensions
Width
680mm
Depth
323mm
Heat Output
High
kW
3.52
Btu/h
12,000
Bermuda SP3 (Natural Gas)
76mm
100mm
100mm
Clearances
76mm
100mm
100mm
Clearances
TECHNICAL DATA
FOR PROPANE TECHNICAL DATA SEE PAGE 35.
6
Injector
Fo2
Injector
Fo2
Pilot Assembly
9401
Heat Input (Gross)
210W (715 Btu/h)
Pilot Assembly
9401
Heat Input (Gross)
210W (715 Btu/h)