Unpacking, Handling and Installation
6.2.1
Unpacking and Handling
This unit is packaged according to the requirements for shipping via the requested type of carrier service.
It is possible that the unit could have been damaged during shipping. For this reason, we urge you to thor-
oughly examine the unit for possible damage and report any such damage to the shipping company
immediately.
Care must be taken in unpacking the unit. Serious damage could result by not checking for clearance
between the item being unpacked and the packaging to be removed.
Handling of the unpacked unit should be performed using only the following devices, see Figure 6-1.
The unit may be furnished with one or more shipping braces for shipping and handling only. After instal-
lation and before operation, these braces must be removed entirely. Under no circumstances should the
braces remain installed during operation or the manufacturer’s warranty for the unit will be voided. The
braces are all tagged and labeled.
6.2.2
Installation of the Unit
6.2.2.1
General
The floor/site must be capable of supporting the weight of the unit. Position the unit so that it is level.
Observe and maintain an ambient temperature range of 43° to 113° F.
The area in which the compressor unit is installed should be well lit and easily accessible to facilitate ser-
vicing and routine maintenance.
6.2.2.2
Electrical Installation
Figure 6-1
Lifting Devices
^
WARNING
Be sure the lifting devices are capable of handling the weight of the unit (see Paragraph 1.4 for the
weight of the unit). Before lifting the unit, secure all loose or swinging parts to keep them from moving.
Stay clear of lifted load.
Fork Lift
Hand Truck
Chain Hoist