![Bartscher 130.110 Manual Download Page 21](http://html.mh-extra.com/html/bartscher/130-110/130-110_manual_477030021.webp)
10
INSTALLATION
INFORMATION
2
Packing and unpacking
The machine is packaged in cardboard with polyester
foam inserts to guarantee full integrity during transport.
Handle the packaging according to the instructions.
Open the packaging and check the integrity of all
components. Keep packaging for future moves.
Lift the machine as indicated and place it in the
installation area.
Installation area
The arranged area must be suitably illuminated and an electrical socket must be available. The resting
surface must be sufficiently ample, even and dry. The fry top must be installed in rooms with non-explosive
environments. In any case, installation must also be performed in consideration of the work safety laws in
force.
Room conditions table
Descriptions
Values
Working temperature
0÷35 °C (32÷95 °F)
Storage temperature
-15 to +65 °C (from –6.8 to +149 °F)
Relative humidity
Maximum 80% with 20 °C room temperature
Maximum 50% with room temperature between 20÷60 °C
Dustiness
Less than 0.03 g/m³
Electrical connections
DANGER – WARNING: Electrical
connections to the supply mains must be
performed by specialised personnel.
Single phase connection
230V – 1Ph
Verify the efficiency of the grounding system in the
building. Make sure that line voltage
(V)
and frequency
(Hz)
correspond to those of the machine (See the
identification plate and wiring diagram). The machine is
equipped with an electrical cord that connects to a multi-
polar plug. The plug is to be connected to a wall switch
equipped with a circuit breaker.