RDG603A73 - Issue 3
Page 38 of 96
22. Installation Check List
Please tick box
Engine alignment correct, clearance all round, check propeller turns by
hand (Ensure ignition is off battery and battery master switch is off)
Anti-Vibration mounts correct height, spacers if necessary. Make sure all
nuts are tight
Exhaust system as specified
Battery leads are of correct size, tightened and start battery is charged
Check tension of alternator belts, wiring connected and belt alignment
checked if removed
Check fuel system is connected correctly and primed
Fuel line water trap installed and water drained off
Check header tank connections are correct way round, constant pipework
rise to header tank
Check level of coolant in header tank and correct ratio of antifreeze to water
All air has been bled from calorifier and pipework
Engine and gearbox oil levels are as specified
Throttle and gear cables correctly adjusted and operating smoothly
All pipework and cabling supported and not chaffing, slack to allow
movement of engine
Engine control panel installed in a position where it is not out in the open
Confirm engine control panel, gauges and warning lights are all operational
Suitable specification of hose between seacock and seawater pump with
no restrictions is fitted
Run the engine for 20 minutes with the boat tied up and in gear (at ½
speed). Check for leaks and that all systems operate correctly
Check & Set the Engine Idle Speed to 875 rpm (when warm)
Check for leaks
Explain/Demonstrate daily/weekly/periodic maintenance checks
Explain/Demonstrate off season storage and maintenance
Installer’s signature
Installer name/company