1324TK - 1624TK OWNER’S MANUAL 12/4/14 Page
6
of
22
CHAIN INSTALLATION
CAUTION!!
The chain is quite heavy. You may want help to lift it.
1.
Slide chain under sprocket, with teeth in the correct cutting direction. Properly installed, the
cutting edges of the chain will face forward on the top of the boom and rearward on the
bottom of the boom (see diagram below).
2.
Start engine and push digging boom control lever forward to lower boom onto the chain. Stop
engine.
3.
Wrap chain around boom and sprocket. Install chain master link or link pin and cotter.
4.
Use boom adjuster screw to tighten chain. Chain should have enough slack to allow
approximately 2" (5cm) of space between middle of boom and chain when boom and chain
are straight out in a horizontal position. Tighten adjuster screw locknut.
Forward
Cutting edge
Cutting edge
Rearward
OPERATOR TRAINING
Rental companies should demonstrate all of the machine operations to each rental customer
including:
•
Starting up the engine.
•
Loading the trencher onto the trailer and securing it for road transport.
•
Unloading the trencher from the trailer.
•
Trenching procedure - Operation of the trencher.
Summary of Contents for 1324TK
Page 14: ...1324TK 1624TK OWNER S MANUAL 12 4 14 Page 14 of 22 ELECTRICAL SCHEMATIC HONDA GX390...
Page 15: ...1324TK 1624TK OWNER S MANUAL 12 4 14 Page 15 of 22 ELECTRICAL SCHEMATIC SUBARU EX40...
Page 16: ...1324TK 1624TK OWNER S MANUAL 12 4 14 Page 16 of 22 ELECTRICAL SCHEMATIC BRIGGS VANGUARD 16HP...
Page 17: ...1324TK 1624TK OWNER S MANUAL 12 4 14 Page 17 of 22 HYDRAULIC SCHEMATIC 1324TK...
Page 18: ...1324TK 1624TK OWNER S MANUAL 12 4 14 Page 18 of 22 HYDRAULIC SCHEMATIC 1624TK...