![Barnes EcoTRAN Station Installation & Operation Manual Download Page 9](http://html1.mh-extra.com/html/barnes/ecotran/ecotran_station-installation-and-operation-manual_3897559009.webp)
9
You should have your local utilities committee mark all utility lines to help determine the proper location. You may also
call 888-258-0808 which is a national directory to identify your local utility authority. On the Internet you can go to the
following website to fi nd your specifi c states information about One Call information.
http://www.call811.com/
The location of your basin should meet the following conditions:
• Not placed in low lying or frequently fl ooded areas
• Ground slopes away from the basin
• Have well draining soil
• Removed from normal traffi c routes
• Close proximity to the structure sewage is originating from to minimize bends and overall inlet line length.
• Does not damage foundations of structures
• Placed in an area accessible to authorized personnel at all times
STEP 4: SETTING THE BASIN: Location Overview