27
Step 21: START UP PRE-CHECKLIST
Prior to performing an electrical and hydraulic performance check of the complete station, verify all of the following
criteria are met:
!
The shut-off and redundant check valve at force main are installed in the lateral discharge and are in the open
position
!
Discharge piping has been pressure tested to 150 PSI max without leakage
!
Inlet has a minimum of 1/8” per foot drop
!
All penetrations through basin and electrical enclosure sealed water-tight
!
Proper backfi ll and compaction has been done to prevent defl ection or possible failure of equipment
!
All cords are secured and clear of pump cutter and level control
!
Electrical supply is of proper voltage, phase for the pump
!
A properly sized double pole circuit breaker has been installed in the service disconnect panel
!
Proper gauge and conductor wire installed from service disconnect to house panel
!
All terminal connections are secure
!
Circuit breakers in the Alarm Box are turned to the “OFF” position
!
Circuit breaker in the service disconnect turned to “ON”
!
Pump is properly seated on the discharge opening in the rail
!
Level control is installed properly
!
Final grade slopes away from the basin to avoid runoff water collection/ basin infl ow
!
All construction and shipping debris has been removed from the basin
Step 22: START-UP CHECKLIST
!
Water has been added to the basin to a level of approximately 1” above the pump support fl ange
!
Valve(s) within the basin and lateral are in the “OPEN” position (Pull on Green Strap in station)
!
Record pump and basin nameplate information on the start-up form (Before installing pump)
!
All alarm devices are turned to the “ON” position
!
Complete START-UP check sheet located in the back of the manual