LIST OF NECESSARY MATERIALS/TOOLS
Additional hardware and miscellaneous supplies are needed for installation. These items are field supplied and must
be sourced before installation. This list also includes tools needed for installation.
List of Materials/Tools
• Personal protective equipment/safety devices
• Miscellaneous hand and power tools and jobsite or
shop materials
• Electrical supplies:
- Circuit breaker for the shelter AC breaker
box (see unit electrical specifications for
requirements)
- 16 gauge minimum, 14 gauge maximum
power wire to connect controller to shelter
power source
- Communication wire: 2-wire, 18 gauge,
shielded with drain
- 5-wire, 18 gauge shielded cable with drain for
remote temperature and humidity sensors
- 18 gauge non-shielded wire for connecting
smoke detector, hydrogen detector and/or
generator, if applicable, to controller
- CAT 6 Ethernet cable of field-determined length
(for remote communication, if applicable)
- Miscellaneous electrical supplies including
rigid/flexible conduit and fittings, 2" x 4"
junction boxes (one per temperature/humidity
sensor), wire connectors and supports
- Fasteners appropriate for the shelter wall
construction to attach the controller to the wall
The following is required and must be sourced prior
to installation of these units.
• One (1) 5A circuit breaker for the shelter DC
power plant (for the controller)
Circuit breakers for Emerson Network Power (ENP)
power plants (used in most telecomm shelters built
today) are available directly through the following
distributors:
• Emerson Network Power: 440.288.1122
• Master Electronics: 888.473.5297 or
www.onlinecomponents.com
Emerson Network Power (ENP) Part Number
• 5A circuit breaker: P/N 101598
Always confirm the application before ordering.
Page