![background image](http://html1.mh-extra.com/html/barco/sp4k-b/sp4k-b_installation-manual_3841108095.webp)
95
R5912128 /03 SP4K-B
Image 7–18
5.
Switch on the projector.
In case you replace one HDD (e.g. degraded mode) the ICMP-X automatically starts with the RAID
recovery process. The red LED of the HDD which has to be rebuilt is blinking. This process takes
about 200 GB per hour. Once the RAID is completed the red LED turns off.
CAUTION:
It's strongly recommended to complete the RAID recovery process prior to starting a
show. This to ensure that the content integrity is preserved and that the show is not interrupted.
Summary of Contents for SP4K-B
Page 1: ...ENABLING BRIGHT OUTCOMES Installation manual SP4K B...
Page 4: ......
Page 8: ...R5912128 03 SP4K B 8...
Page 22: ...R5912128 03 SP4K B 22 Safety...
Page 54: ...R5912128 03 SP4K B 54 Physical installation projector...
Page 68: ...R5912128 03 SP4K B 68 Lenses and Lens holder...
Page 76: ...R5912128 03 SP4K B 76 ICMP X...
Page 96: ...R5912128 03 SP4K B 96 ICMP X...
Page 104: ...R5912128 03 SP4K B 104 Projector Power Cycle...
Page 110: ...R5912128 03 SP4K B 110 Connectivity...
Page 113: ...113 R5912128 03 SP4K B Image 10 3 Sealed top cover remove Convergence...
Page 115: ...115 R5912128 03 SP4K B 1 1 Image 10 6 Sealed cover fixation Convergence...
Page 140: ...R5912128 03 SP4K B 140 1 Image 12 17 Tightening the screws of the side cover Projector Covers...
Page 144: ...R5912128 03 SP4K B 144 Projector Covers...
Page 152: ...R5912128 03 SP4K B 152 List of tools...
Page 156: ...R5912128 03 SP4K B 156 Index...
Page 157: ......