R5912128 /03 SP4K-B
28
Image 2–4 Removing corner foam blocks
9.
Mount 4 M10 eyebolts in the foreseen openings in the top cover, as illustrated in the following image.
Image 2–5 Example of eye bolts mounted in the top cover
10.
Lift the projector from the pallet using a hoisting tool.
Image 2–6
Caution:
Take into account the weight of the projector when manipulating the projector. For this
reason, make sure to only use a hoisting or lifting tool to lift up and move the projector.
Make sure to provide a hoisting or lifting tool capable of lifting and moving the projector to its
designated position.
Summary of Contents for SP4K-B
Page 1: ...ENABLING BRIGHT OUTCOMES Installation manual SP4K B...
Page 4: ......
Page 8: ...R5912128 03 SP4K B 8...
Page 22: ...R5912128 03 SP4K B 22 Safety...
Page 54: ...R5912128 03 SP4K B 54 Physical installation projector...
Page 68: ...R5912128 03 SP4K B 68 Lenses and Lens holder...
Page 76: ...R5912128 03 SP4K B 76 ICMP X...
Page 96: ...R5912128 03 SP4K B 96 ICMP X...
Page 104: ...R5912128 03 SP4K B 104 Projector Power Cycle...
Page 110: ...R5912128 03 SP4K B 110 Connectivity...
Page 113: ...113 R5912128 03 SP4K B Image 10 3 Sealed top cover remove Convergence...
Page 115: ...115 R5912128 03 SP4K B 1 1 Image 10 6 Sealed cover fixation Convergence...
Page 140: ...R5912128 03 SP4K B 140 1 Image 12 17 Tightening the screws of the side cover Projector Covers...
Page 144: ...R5912128 03 SP4K B 144 Projector Covers...
Page 152: ...R5912128 03 SP4K B 152 List of tools...
Page 156: ...R5912128 03 SP4K B 156 Index...
Page 157: ......