R5906897 /02
Prometheus III
40
1
2
A
B
Image 4-10: UPS connection
3.
Secure the UPS inlet socket with a fixation spring. Handle as follow:
•
Squeeze the fixation spring together.
•
Slide the fixation spring on the fixation pins while squeezing together and push it against the power plug.
•
Release the fixation spring.
4.
Install on the power outlet the second fixation spring to prevent losing it (2).
CAUTION:
The electrical connection with the UPS INLET socket of the projector must be done with
a certified AC power supply cord (minimum 0,75 mm² or 18 AWG and minimum 300V)
CAUTION:
Do not use the power OUTLET socket of the projector to provide power to other
equipment!
Summary of Contents for Prometheus III
Page 1: ...ENABLING BRIGHT OUTCOMES Installation manual Prometheus III...
Page 8: ...R5906897 02 Prometheus III 8...
Page 32: ...R5906897 02 Prometheus III 32 Installation process...
Page 62: ...R5906897 02 Prometheus III 62 Physical installation stand alone cooler...
Page 80: ...R5906897 02 Prometheus III 80 Lenses lens holder...
Page 98: ...R5906897 02 Prometheus III 98 Input communication...
Page 100: ...R5906897 02 Prometheus III 100 Installing a HDD into the ICMP ICMP...
Page 132: ...R5906897 02 Prometheus III 132 Communicator Touch Panel...
Page 148: ...R5906897 02 Prometheus III 148 Removal and installation of the projector covers...
Page 152: ...R5906897 02 Prometheus III 152 Preventative maintenance actions...
Page 170: ...R5906897 02 Prometheus III 170 Convergence...
Page 176: ...R5906897 02 Prometheus III 176 Color calibration...
Page 199: ...R5906897 02 Prometheus III 199 Environmental Information...