R5906897 /02
Prometheus III
30
3.1 Installation process projector
Installation process from A to Z
1.
Check if all installation requirements are fulfilled
such as the environment conditions of the installation
area, electrical facilities, etc. Note that a solid pedestal is required to support the projector. For more info see
topic
installation requirements
.
2.
Physical installation of the projector
upon its pedestal.
3.
Electrical connection with the power net
. See chapter
Connecting the Prometheus III with the power net
,
4.
Installation of the lens
. First select a lens with appropriate throw ratio covering the screen size and the
projector - screen distance. Then install the lens in the lens holder of the projector. For more information about
available lenses, lens selection and lens installation see chapter
, page 63.
Caution:
The projector is delivered with a plastic cover inside the Lens Holder. Remove the cover prior
to installing the lens.
5.
Installation of the ICMP, IMB, IMS or HDSDI input module
. (only in case no ICMP, or IMB or IMS or HDSDI
is factory installed).
6.
Installation of the HDDs.
In case the HDDs of the ICMP are delivered separated from the projector remove
the protection tape from the HDD input slots and install all three HDDs as described in the procedure
Installing a HDD into the ICMP
, page 125. Make sure that all HDDs in the ICMP HDD set have the same
storage capacity. See label on top of the HDD to know the storage capacity.
7.
Installation of the Cooler.
See
Installation process stand alone cooler
, page 30.
8.
(Option)
Installation
of the optional Communicator touch panel on the projector. In both stand alone and top
pack solutions, it is possible to install a Barco communicator touch panel. Note: If the customer chose the top
pack solution it is recommended to install the top cooler first, then the touch panel.
9.
Upgrade all software to the latest available version. See
, page 30.
10.
Start up your projector and adjust the system. See
“
Starting up and adjusting the system
”
, page 31.
3.2 Installation process stand alone cooler
Installation process from A to Z
1.
Assembling
of the cooling
box housing
. The housing is delivered as a flat pack and should be assemble
during the installation process.
2.
Mounting of the cooler housing
on its support.
3.
Mounting the empty cooler assembly
on the stand alone frame.
4.
Insert the cooler units
and filters.
5.
Establish the
hose connections
(4x) between the cooler and the projector. Connect also the four
cables
.
3.3 Software upgrade
How to upgrade the software
1.
Switch on the projector. The projector can now be switched on. Place the
ON/OFF
switch of the projector in
the
”
I
”
position. As a result the projector starts to initialize. The status lights of the projector lights up GREEN
once the projector is initialized. In case the status lights up RED may indicate a tamper event during transport.
If so, contact Barco customer service.
2.
Download and install the latest version of Communicator. The program can be downloaded for free from
Barco's website, (URL:
http://www.barco.com
). Click on
myBarco
and login to get access to secured
information. Registration is necessary.
Summary of Contents for Prometheus III
Page 1: ...ENABLING BRIGHT OUTCOMES Installation manual Prometheus III...
Page 8: ...R5906897 02 Prometheus III 8...
Page 32: ...R5906897 02 Prometheus III 32 Installation process...
Page 62: ...R5906897 02 Prometheus III 62 Physical installation stand alone cooler...
Page 80: ...R5906897 02 Prometheus III 80 Lenses lens holder...
Page 98: ...R5906897 02 Prometheus III 98 Input communication...
Page 100: ...R5906897 02 Prometheus III 100 Installing a HDD into the ICMP ICMP...
Page 132: ...R5906897 02 Prometheus III 132 Communicator Touch Panel...
Page 148: ...R5906897 02 Prometheus III 148 Removal and installation of the projector covers...
Page 152: ...R5906897 02 Prometheus III 152 Preventative maintenance actions...
Page 170: ...R5906897 02 Prometheus III 170 Convergence...
Page 176: ...R5906897 02 Prometheus III 176 Color calibration...
Page 199: ...R5906897 02 Prometheus III 199 Environmental Information...