R5906790 /04
Athena
67
Image 8-9
3.
Insert the HDD into the HDD slot. Ensure that the handle is sufficiently open so that the hook (reference 1) of
the handle can pass the front plate of the ICMP(-X).
1
Image 8-10
4.
Push the HDD completely and firmly inside its slot, close the handle, and move the latch towards the right.
Image 8-11
5.
Switch on the projector.
In case you replace one HDD (e.g. degraded mode) the ICMP(-X) automatically starts with the
RAID recovery process. The red LED of the HDD which has to be rebuilt is blinking. This process
takes about 200 GB per hour. Once the RAID is completed the red LED turns off.
CAUTION:
It's strongly recommended to complete the RAID recovery process prior to starting a
show. This to ensure that the content integrity is preserved and that the show is not interrupted.
Summary of Contents for Athena
Page 1: ...ENABLING BRIGHT OUTCOMES Installation manual Athena ...
Page 8: ...R5906790 04 Athena 8 ...
Page 28: ...R5906790 04 Athena 28 Installation process ...
Page 36: ...R5906790 04 Athena 36 Physical installation ...
Page 58: ...R5906790 04 Athena 58 Input Communication ...
Page 100: ...R5906790 04 Athena 100 Starting up ...
Page 126: ...R5906790 04 Athena 126 Lamp House ...
Page 130: ...R5906790 04 Athena 130 Preventative maintenance actions ...
Page 151: ...R5906790 04 Athena 151 1 Image 16 18 Removal and installation of the projector covers ...
Page 152: ...R5906790 04 Athena 152 Removal and installation of the projector covers ...
Page 160: ...R5906790 04 Athena 160 Specifications ...
Page 168: ...R5906790 04 Athena 168 Pin configurations ...
Page 169: ...169 R5906790 04 Athena Environmental information C ...
Page 178: ...Glossary R5906790 04 Athena 178 ...
Page 183: ...R5906790 04 Athena 183 ...