R5906790 /04
Athena
34
1
1
2
Image 5-6
4.
Plug out the connector which is plugged into the AC socket (3). Plug the connector in the UPS socket (4).
3
4
Image 5-7
5.
Install the SMPS cover and install the 2 screws. Use a 3mm Allen wrench.
6.
Install the rear cover. See
“
Installation of the rear cover
”
7.
Install the UPS according to the instructions of the manufacturer and the local regulations.
8.
Connect the power output cord from the UPS unit to the UPS inlet socket (5) of the projector.
Summary of Contents for Athena
Page 1: ...ENABLING BRIGHT OUTCOMES Installation manual Athena ...
Page 8: ...R5906790 04 Athena 8 ...
Page 28: ...R5906790 04 Athena 28 Installation process ...
Page 36: ...R5906790 04 Athena 36 Physical installation ...
Page 58: ...R5906790 04 Athena 58 Input Communication ...
Page 100: ...R5906790 04 Athena 100 Starting up ...
Page 126: ...R5906790 04 Athena 126 Lamp House ...
Page 130: ...R5906790 04 Athena 130 Preventative maintenance actions ...
Page 151: ...R5906790 04 Athena 151 1 Image 16 18 Removal and installation of the projector covers ...
Page 152: ...R5906790 04 Athena 152 Removal and installation of the projector covers ...
Page 160: ...R5906790 04 Athena 160 Specifications ...
Page 168: ...R5906790 04 Athena 168 Pin configurations ...
Page 169: ...169 R5906790 04 Athena Environmental information C ...
Page 178: ...Glossary R5906790 04 Athena 178 ...
Page 183: ...R5906790 04 Athena 183 ...