![Barbieri Spectro LFP qb Operating Manual Download Page 9](http://html1.mh-extra.com/html/barbieri/spectro-lfp-qb/spectro-lfp-qb_operating-manual_3795611009.webp)
9
Spectro LFP qb - Operating Manual
Chapter 2: Putting into operation
2.1 Installing the hardware
When unpacking a new Spectro LFP qb device, the following procedure
has to be done to put al components together:
- fit the supplied battery pack into its place on the back of the Spectro
LFP qb spectral unit.
- mount the spectral unit onto the device by inserting it until it is fixed
by the magnets
- mount the Sensing unit by inserting it into the extension connector
on the left side of the platform
- mount the guide which helps support samples be inserting it into the
appropriate wholes at the right side of the platform
Installing the connecting cables:
• The power supply for the spectrophotometer is connected to the rear
side of the instrument
• When connecting the instrument by USB port, use the supplied USB-C
cable and connect it to your computer (a optional USB-B port is present
for legacy software and hardware compatibility)
• When connecting to a TCP/IP network, use a Ethernet cable and con-
nect the instrument to your LAN