1. Carefully put the end of a screwdriver
under a panel and lift it up.
2. Remove the vermiculite panel.
3. Do step 1. and 2. again for the other
vermiculite panels.
9.5
Installation of the interior of the combustion chamber
Note:
To avoid that interior pieces do not fit, make sure all ashes are removed.
1. Install the vermiculite panels. Refer to section
2. Install the cast iron side panels. Refer to section
.
3. Install the steel bottom plates. Refer to section
4. Install the cast iron rear panels. Refer to section
5. Install the grate. Refer to section
6. Install the upper baffle. Refer to section
7. Install the lower baffle. Refer to section
.
8. Install the heat shield. Refer to section
.
9.5.1
Install the vermiculite panels
1. Put the top of the vermiculite panel in
the U-shaped holder in the appliance.
2. Move the vermiculite panel to a
vertical position.
3. Lower the vermiculite panel.
4. Repeat this procedure for the other
vermiculite panels.
9.5.2
Install the cast iron side panels
Only do this procedure after finish of the procedure in section
.
1x
4x
1x
1x
1x
4x
Maintenance
BOX 30 75
31
Summary of Contents for BOX30 75
Page 45: ...Warranty Terms BOX 30 75 45...
Page 46: ...Warranty Terms 46 BOX 30 75...
Page 47: ...Warranty Terms BOX 30 75 47...