36
Control programme
t
4
5s
Putting control circuit under atmospheric pressure
t
6
7,5s
Time between start-up and energizing of main “AR” relay
t
1
22,5s
1st verification stage at atmospheric pressure
t
3
5s
Putting control circuit gas under pressure
t
2
27,5s
2nd verification stage at gas pressure
t
5
67,5s
Total time of tightness control, up to burner operation consent
t
20
22,5s
Return of programmer to rest position = fresh verification is enabled
AL
remote alarm signalling
AR
main relay with “ar” contacts
AS
equipment fuse
BR
blocking relay with “ar” contacts
DW
outer pressure switch (tightness control)
EK...
unblocking button
GP
outer pressure switch (for mains gas pressure)
HR
auxiliary relay with “ar” contacts
L1
equipment trouble signalling lamp
SK
line switch
I...XI
programmer cam contacts
Course of programme
Terminals activated by
equipment or by electric
connections
Summary of Contents for TS 0 GN
Page 2: ......
Page 47: ......
Page 48: ......
Page 49: ......
Page 50: ......
Page 51: ......
Page 52: ......
Page 53: ......
Page 54: ......
Page 55: ......
Page 56: ......
Page 57: ......
Page 58: ......
Page 59: ......
Page 60: ......
Page 61: ......
Page 62: ......
Page 63: ......
Page 64: ......
Page 65: ......
Page 66: ......
Page 67: ......
Page 68: ......
Page 69: ......
Page 70: ......
Page 71: ......
Page 72: ......
Page 73: ......
Page 74: ......
Page 75: ......
Page 76: ......
Page 77: ......
Page 78: ......
Page 79: ......
Page 80: ......
Page 81: ......
Page 82: ......
Page 83: ......
Page 84: ......
Page 85: ......
Page 86: ......
Page 87: ......
Page 88: ......
Page 89: ......
Page 90: ......
Page 91: ......
Page 92: ......
Page 93: ......
Page 94: ......
Page 95: ......