MAINTENANCE TIME
Part description
Action to be performed
Diesel
COMBUSTION HEAD
IGNITION PILOT
VISUAL INSPECTION OF THE INTEGRITY OF CERAMICS. TIP GRINDING, CHECK DISTANCE, CHECK
ELECTRICAL CONNECTION
YEARLY
ELECTRODES
VISUAL INSPECTION OF THE INTEGRITY OF CERAMICS. TIP GRINDING, CHECK DISTANCE, CHECK
ELECTRICAL CONNECTION
YEARLY
FLAME DISC
INTEGRITY VISUAL CHECK FOR ANY DEFORMATIONS, CLEANING,
YEARLY
COMBUSTION HEAD COMPONENTS
INTEGRITY VISUAL CHECK FOR ANY DEFORMATIONS, CLEANING,
YEARLY
LIQUID FUEL NOZZLE
CHECKING AND REPLACING, IF NECESSARY, SOLENOID VALVES AND SEALING RINGS, CLEANING
ORIFICE AND SWIRLER
YEARLY
INSULATING GASKET
SEAL VISUAL INSPECTION AND POSSIBLE REPLACEMENT
YEARLY
AIR LINE
AIR GRILLE/DAMPERS
CLEANING
YEAR
AIR DAMPER BEARINGS
GREASING, (Note: apply only on burners with bearings requiring lubrication)
YEAR
FAN
FAN AND SCROLL CLEANING, DRIVE SHAFT GREASING
YEAR
AIR PRESSURE SWITCH
CLEANING
YEAR
AIR PRESSURE PORT AND PIPES
CLEANING
YEAR
SAFETY COMPONENTS
FLAME SENSOR
CLEANING
YEAR
VARIOUS COMPONENTS
MECHANICAL CAM
CHECK OF WEAR AND OPERATION, GREASING OF SLIDING BLOCK AND SCREWS
YEAR
LEVERS/TIE-RODS/BALL JOINTS
CHECK OF ANY WEAR, COMPONENT LUBRICATION
YEAR
COMBUSTION HEAD EXTRACTION KIT
CHECKING WEAR AND OPERATION
YEAR
FUEL LINE
HOSES
REPLACEMENT
5 YEARS
PUMP FILTER
CLEANING
YEAR
LINE FILTER
FILTERING ELEMENT CLEANING / REPLACEMENT
YEAR
COMBUSTION PARAMETERS
CO CONTROL
COMPARISON WITH VALUES RECORDED AT SYSTEM START-UP
YEAR
CO2 CONTROL
COMPARISON WITH VALUES RECORDED AT SYSTEM START-UP
YEAR
BACHARACH SMOKE INDEX CONTROL
COMPARISON WITH VALUES RECORDED AT SYSTEM START-UP
YEAR
NOX CONTROL
COMPARISON WITH VALUES RECORDED AT SYSTEM START-UP
YEAR
SMOKE TEMPERATURE CONTROL
COMPARISON WITH VALUES RECORDED AT SYSTEM START-UP
YEAR
LIQUID FUEL DELIVERY/RETURN
PRESSURE CONTROL
COMPARISON WITH VALUES RECORDED AT SYSTEM START-UP
YEAR
PRESSURE REGULATOR
PRESSURE MEASURED AT START-UP
YEAR
IMPORTANT
In case of heavy-duty operation or when using special fuels, the maintenance intervals must be reduced adapting them to the real
operating conditions, according to the indications of the maintenance technician.
31 / 40
0006160435_202112
ENGLISH
Summary of Contents for TBL 18P
Page 2: ......
Page 38: ...SCHEMI ELETTRICI TBL 18P TBL 26P 36 40 0006160435_202112 ITALIANO...
Page 39: ...TBL 35P DACA 37 40 0006160435_202112 ITALIANO...
Page 40: ...TBL 35P TBL 45P 38 40 0006160435_202112 ITALIANO...
Page 42: ...40 40 0006160435_202112 ITALIANO...
Page 78: ...WIRING DIAGRAMS TBL 18P TBL 26P 36 40 0006160435_202112 ENGLISH...
Page 79: ...TBL 35P DACA 37 40 0006160435_202112 ENGLISH...
Page 80: ...TBL 35P TBL 45P 38 40 0006160435_202112 ENGLISH...
Page 82: ...40 40 0006160435_202112 ENGLISH...
Page 83: ......