12 / 28
0006081325_201210
ENGLISH
APPLICATION OF BURNER TO BOILER
HEAD UNIT ASSEMNLY
• Adjust the position of connector flange 5 by loosening the
screws 6 so that the combustion head penetrates the advised
amount into the combustion chamber as recommended by the
generator’s manufacturer.
• Position the seal insulation 3 on the tube unit inserting cord 2
between flange and seal.
• Fasten the Combustion Head unit 4 to the boiler 1 by means
of the stud bolts, washers and the nuts provided 7.
!
Competely seal the space between the tube unit of the burner
and the hole in the refractory panel using suitable materials
to do so.
ASSEMBLYOFVENTILATION SYSTEM
• Position the half-hinge on the burner scroll in line with those on
the combustion head assembly.
• Put the hinge pin 10 in the position considered most suitable.
• Connect the cable switch on to thecorresponding electrodes,
close the hinge, locking the burner by means of screws 11.
COMPLETING BURNER SETUP
• Remove the protective yellow caps from the connectors beneath
the combustion head and close to the solenoid valves.
• Connect the 12 light oil pipes provided with the burner to their
corresponding connectors, making sure they are properly sealed.
Summary of Contents for TBL 105P
Page 2: ......
Page 26: ...26 28 0006081325_201210 ENGLISH ELECTRIC DIAGRAM ...
Page 27: ...27 28 0006081325_201210 ENGLISH ...
Page 52: ...26 28 0006081325_201210 ESPAÑOL ESQUEMA ELECTRICO ...
Page 53: ...27 28 0006081325_201210 ESPAÑOL ...
Page 78: ...26 28 0006081325_201210 FRANÇAIS SCHEMA ELECTRIQUE ...
Page 79: ...27 28 0006081325_201210 FRANÇAIS ...
Page 104: ...26 28 0006081325_201210 DEUTSCH SCHALTPLAN ...
Page 105: ...27 28 0006081325_201210 DEUTSCH ...
Page 107: ......