ENGLISH
12 / 28
0006081514_201711
BURNER CONNECTION TO THE BOILER
ASSEMBLING THE HEAD UNIT
The burner head is packaged separately from the body of the burner.
Anchor the burner to the boiler door as follows:
•
Position the insulating seal -13 on the sleeve.
•
Anchor the flange of the buffer -15 to the boiler flange -1 with the
stud bolts, washers and nuts provided -7.
DANGER / CAUTION
Completely seal the gap between the burner sleeve and
the hole in the refractory material inside the boiler door with
suitable material.
ASSEMBLY OF VENTILATION SYSTEM
•
Position the hinge pin -31 on the burner screw nut near the lower
half-hinge -12 , and insert it in the hole.
•
Position the hinge pin -31 on the burner screw nut near the lower
half-hinge -12 , and insert it in the hole.
For the handling of the burner, it is recommended to use a suitable
hoisting equipment to be anchored to the eyebolts shown in figure.
•
Insert the upper half-hinge -17 in the pin -14 and anchor it to the
sleeve with the two screws and the washers provided -15.
12
31
15
17
14
Summary of Contents for 67200010
Page 2: ......
Page 25: ...ITALIANO 23 28 0006081514_201711 SCHEMI ELETTRICI TBG 480 2000 ME ...
Page 26: ...ITALIANO 24 28 0006081514_201711 TBG 480 2000 ME ...
Page 27: ...ITALIANO 25 28 0006081514_201711 TBG 480 2000 ME ...
Page 28: ...ITALIANO 26 28 0006081514_201711 TBG 480 2000 ME ...
Page 30: ......
Page 53: ...ENGLISH 23 28 0006081514_201711 WIRING DIAGRAMS TBG 480 2000 ME ...
Page 54: ...ENGLISH 24 28 0006081514_201711 TBG 480 2000 ME ...
Page 55: ...ENGLISH 25 28 0006081514_201711 TBG 480 2000 ME ...
Page 56: ...ENGLISH 26 28 0006081514_201711 TBG 480 2000 ME ...
Page 58: ......
Page 59: ......