HABFM-1401001
VERSION: 07_9
FLIGHT MANUAL
–
BALLONS CHAIZE
FLIGHT MANUAL
–
BALLONS CHAIZE
–
PAGE 39/64
Siège Social / Headquarters:
Chemin de Mirecouly - 07100 Annonay
| Atelier / Workshop:
188, avenue Ferdinand Janvier - 07100 Annonay - France
Atelier / Workshop - Tél. +33 (0)4 75 33 65 18 - Mobile - Tél. +33 (0)6 32 00 04 83 - [email protected] -
www.ballonschaize.com
SARL au capital de 20.00
0€
•
SIRET 790820062 0001
2 • TVA FR54 790820062 00012
IV.1
Introduction
This section provides a list of detailed actions and procedures for normal use.
This section is EASA approved.
IV.2
Site of inflation
This should be a flat surface, without any roughness or protrusions that could tear the envelope.
Should the site be covered in vegetation, ensure that it is not of a type that spreads fire.
•
There should be no dangerous obstacles nearby.
•
If possible, the site should be sheltered from the wind.
•
The site should be sufficiently large to accommodate the entire balloon stretched out on
the ground, with the basket, as well as the crown line.
IV.3
Weather Conditions
In compliance with operating limits (SECTION II Operating Limits)
IV.4
Operating rules
Before placing the balloon on the take-off site:
•
replenish the liquid propane bottles, taking care to observe relevant safety rules;
•
Place the filled liquid propane bottles on board the basket;
•
Connect the burner and pilot light fuel supply pipes;
•
Open the spigot of the bottle that supplies the pilot light (master bottle) and ignite it using
a piezoelectric device, cigarette lighter or any other flame source.
•
Verify proper working of:
o
The master bottle and each burner's supply circuit;
o
The second bottle and the main fuel supply circuits to the burners;