5
HARDWARE:
Pole Assembly
IMPORTANT
• Allow 48 hours for concrete to cure before beginning.
• Check to see that no concrete or debris obstructs threads in
ground anchor bolt holes by threading anchor bolts in and out.
Step 1:
Remove five plastic plugs from threaded
holes in ground anchor.
Also remove hinge pin and hex nut
and place near anchor plate. (These will be used in Step 3.)
TIME OUT TIP:
To protect pole finish, place square
packing pad (included in pole box) on the ground
at the bottom of pole. Remove once pole is held by
installation clip.
Step 2:
Unpack pole and jack.
Jack comes packaged with
the pole. Jack will be used in Jack Attachment instructions.
Step 3:
Align pole hinge with anchor plate hinge
, then
insert hinge pin and hand tighten hex nut.
Step 4:
Lift pole to approximately 30º and attach
installation clip
to ground anchor and pole to maintain the
installation angle.
IMPORTANT
The installation clip
MUST
remain in place until pole is raised in
Goal Alignment, page 9.
WARNING
Two or three people in good physical condition and capable of
lifting at least 90-100 lbs. (40-45 kg) each are recommended for
safe installation and assembly.
3
/
8
”x 6” Hinge Pin (1)
3
/
8
” Hex Nut (1)
1
/
2
x
1
1
/
4
”
Anchor Bolt (1-black)
Step 4
Step 3
Installation
Clip
Hinge
Pin
Hex
Nut
Summary of Contents for Icon Series
Page 15: ...15 This page intentionally left blank...
Page 16: ......