WARNING!
For safe assembly, do the following:
• Use two or three people to raise goal assembly and hold it in
a vertical position. Two or three people in good physical con-
dition and capable of lifting at least 90-100 lbs. (40-45 kg)
each are recommended for safe installation and assembly.
•
DO NOT
adjust height of backboard or attach rim until pole is
raised and appropriately bolted.
• Correct sequence of hardware installation
MUST
be followed
during assembly.
To avoid injury, keep fingers and toes away from the ground
plate while raising the goal assembly to the vertical position.
Step 1:
Remove banding and edge protection from
backboard.
Peel back TOP
1
/
3
of protective sheeting from the
backboard. This will allow you to reach the sheeting once goal
has been raised, yet protects the surface of the backboard during
installation.
Step 2:
Locate five anchor bolts.
Prepare them for use by
having lock washers slipped on and placed near ground anchor.
Step 3:
Using at least two people, carefully push
up on backboard to raise goal assembly to vertical
position.
The installation clip will fall away. Save installation clip
for future disassembly.
9
Step 4:
Fasten pole to threaded ground anchor plate
by installing and hand tightening the three rear anchor bolts with
lock washers.
Step 5:
Fasten pole to threaded ground anchor plate
by installing and hand tightening the two front anchor bolts with
lock washers.
TIME OUT TIP:
Install rear three anchor bolts first
and then the front two anchor bolts.
Step 6:
Snug tighten the five anchor bolts, then
check goal assembly with a level and inspect visually
to determine if it is parallel and plumb to the playing surface.
Step 7:
If adjustments are necessary,
slightly loosen
bolts to rotate goal.
Step 8:
Fully tighten five bolts
using a
3
/
4
” socket with a
torque wrench. The torque wrench is to be set at 75 ft/lb on dry
threads and 55 ft/lb on lubricated threads.
NOTE:
The anchor
plate is threaded, so there is no need to use nuts on bolts.
IMPORTANT
The bolts must pass all the way through the ground anchor
plate. If they do not pass through the ground anchor plate
when fully tightened,
STOP
installation, contact
Ball Hog
and
DO NOT
allow play.
Goal Alignment
Step 3
1
/
2
x
1
1
/
4
”
Anchor Bolt (5-black)
1
/
2
” Lock
Washer (5)
HARDWARE:
TOOLS:
3
/
4
” Socket, Level,
1
/
2
” Drive Torque Wrench
End of anchor bolt
should extend
1
/
8
”
below anchor plate.
Play
ing
Su
rfac
e
Step 4
Step 5
Lock
Washer
Anchor
Bolt
Ground
Anchor Plate
Summary of Contents for Icon Series
Page 15: ...15 This page intentionally left blank...
Page 16: ......