Care2
Installation Instructions
84
Care2 issue 7
7.8.2.2 Weekly Functional Test
Each week, a functional test of a Remote Unit should be
performed to ensure it can make and receive clear and intelligible
calls to the relevant Console(s).
A different Remote Unit should be used each week, so that all
units will get tested in rotation.
7.8.2.3 Six Monthly Inspection by a “Competent Person”
The Standard recommends that every six months the System
should be thoroughly inspected to ensure continued reliability.
The “Competent Person” must have suitable knowledge and
equipment to be able to check the system.
Baldwin Boxall can perform these Inspections under a Service
Agreement.
N
OTE
: The result of this weekly test and the identity of the Remote Unit
used should be recorded.
N
OTE
: The result of this inspection and any outstanding defects will be
reported to the "Responsible Person". These should be recorded.