4-4 Operation
MN2488
Light Tower Setup
See Figure 4-1 for component identification.
WARNING: When erecting or stowing the mast assembly, be aware of the pinch points such as where the
tower structures join or where the cable and winch are located. Careless operation can result
in injury. Keep extremities away from moving parts to avoid injury.
WARNING: Before erecting the mast assembly, be certain that the outriggers are properly set to stabilize
the unit and that they are secure and are not damaged. Erecting the mast without setting the
outriggers can cause the unit to tip over when raising the mast.
WARNING: Before erecting the mast assembly, be certain that there are no overhead wires. Contact with
overhead wiring presents an electrical shock hazard that may cause severe injury or death.
WARNING: Before erecting the mast assembly, be certain that there are no overhead obstructions that
the mast will hit when raising it. Hitting an object (tree limb etc.) may damage the mast or
cause the unit to tip over and may result in injury or property damage.
WARNING: Never move or reposition a light tower when the mast is extended or in the vertical position.
Unless the mast is in its stowed position, it may contact overhead wires or cause the light
tower to be unbalanced or tip over.
1.
With the Light Mast in its’ stowed position, install or reposition the four light fixtures to
the desired placement when the tower is raised.
2.
Pull the Mast Lock pin so the mast is no longer secured in the stowed position.
3.
Pull the Tilt Lock pin so it is not in the way when the mast is raised.
4.
Use the Tilt Winch to raise the mast to the vertical position.
Figure 4-4
Mast Rotation Lock
Front Jack
Tilt Lock Pin must be installed
before mast is raised.
Lift Winch
Tilt Winch
Rear Jack
Mast Lock Pin
Tow Bar
5.
Secure the mast in the vertical position by inserting and locking the the Tilt Lock pin,
The Tilt Lock pin must be installed and the mast secured in the
vertical position before the mast is raised.
6.
Use the Lift Winch to raise the mast to the desired height. The winch is self
−
braking
and will lock in place automatically.
7.
To rotate the lights to the desired position, loosen the Mast Rotation Lock on the collar
of the mast, rotate the mast to the desired position and tighten the Mast Rotation Lock.
The light tower is now setup for operation.
Summary of Contents for POW'R LITE PL6000K
Page 1: ...POW R LITE PL6000K Portable Light Tower Installation Operating Manual 9 06 MN2488 ...
Page 4: ...ii Table of Contents MN2488 ...
Page 12: ...2 2 General Information MN2488 ...
Page 17: ...Receiving Installation 3 5 MN2488 Figure 3 3 Trailer Harness ...
Page 18: ...3 6 Receiving Installation MN2488 ...
Page 30: ...5 4 Troubleshooting and Maintenance MN2488 Figure 5 7 Flood Light Mast Wiring ...
Page 31: ...Troubleshooting and Maintenance 5 5 MN2488 Figure 5 8 Engine and Control Wiring ...
Page 32: ...5 6 Troubleshooting and Maintenance MN2488 ...
Page 33: ...Baldor District Offices ...