Operation 4-3
MN2488
Figure 4-2 Lug Nut Tightening Specifications
Description
1/2” Cone nut
5/8” Cone nut
5/8” Cone nut
3/4” Hex nut
4 Bolt
5 Bolt
6 Bolt
8 Bolt
10 Bolt
Tightening
Sequence
Application
12”
−
13” Wheel
14”
−
16” Wheel
Flat Disc Wheel
Clamp Ring
Demountable Ring Clamp
Minimum Torque (ft
−
lbs.)
50
90
175
190
210
Maximum Torque (ft
−
lbs.)
65
120
225
210
260
Torque
Specification
1
2
3
4
1
2
3
4
5
7
6
8
1
2
3
4
5
1
6
3
2
4
5
1
2
6
3
8
10
5
7
9
4
WARNING: The mast assembly must remain in the stowed position until the outriggers are properly set to
stabilize the trailer . Erecting the mast without setting the outriggers can cause the light
tower set to tip over when raising the mast.
Trailer Setup
See Figure 4-1 for component identification. Carefully read all instructions before starting.
1.
Locate a suitable, level location (
±
5% incline maximum). Do not use the POW’R LITE
on grades that are greater than 5%. Also be sure there are no overhead wires or
obstructions.
The POW’R LITE is balanced so the majority of the weight rests on the tow bar (front
Jack). If on an incline, the safest way to position the tailer is to have the tow bar facing
down the incline (front of the trailer lower than the rear of the trailer).
2.
Apply and check the parking brake if equipped (optional equipment).
3.
Disconnect the safety chains and the trailer light connector from the tow vehicle.
4.
Pull the pin on the front jack and rotate the jack 90 degrees to the vertical position.
Lock the jack in the vertical position using the pin to secure it.
5.
Move the Coupler Handle to the vertical position to release the ball hitch.
6.
Use the jack to raise the trailer coupler from the ball hitch of the tow vehicle.
7.
The tow vehicle can now be moved away from the POW’R LITE.
Figure 4-3 Trailer Outrigger
Outriggers Extended
Right Jack
Left Jack
Outrigger Lock
Outrigger
Jack Lock Pin
Outriggers Stowed
8.
Pull the Outrigger Lock for the right jack and fully extend the right outrigger. Lock the
outrigger into position using the Outrigger Lock.
9.
Pull the Jack Lock Pin for the right jack and rotate the jack to the vertical position. Lock
the jack in its vertical position using the Jack Lock Pin.
10. Repeat steps 8 and 9 for the left outrigger and jack.
11. With the rear trailer stabilization in its fully extended position (Figure 4-3 right view),
adjust the three jacks to level the trailer. All three jacks must be in firm contact with the
ground and the trailer must be level so the light tower will be vertical when raised.
Summary of Contents for POW'R LITE PL6000K
Page 1: ...POW R LITE PL6000K Portable Light Tower Installation Operating Manual 9 06 MN2488 ...
Page 4: ...ii Table of Contents MN2488 ...
Page 12: ...2 2 General Information MN2488 ...
Page 17: ...Receiving Installation 3 5 MN2488 Figure 3 3 Trailer Harness ...
Page 18: ...3 6 Receiving Installation MN2488 ...
Page 30: ...5 4 Troubleshooting and Maintenance MN2488 Figure 5 7 Flood Light Mast Wiring ...
Page 31: ...Troubleshooting and Maintenance 5 5 MN2488 Figure 5 8 Engine and Control Wiring ...
Page 32: ...5 6 Troubleshooting and Maintenance MN2488 ...
Page 33: ...Baldor District Offices ...