background image

10  |  Baker Hughes

Copyright 2022 Baker Hughes Company. All rights reserved.

10.  PILOT GAS HEATERS (OPTIONAL):

 Pilot supply gas can 

be heated to prevent the formation of ice or hydrates in the 

pilot system. Pilot supply gas heaters should be connected 

after the pilot filter (if one is used).

11.  CONTROL LINES: 

The user will need to install a 

DOWNSTREAM SENSE line (CONTROL LINE) from 

the back port on the actuator to a location at least 8-10 

pipe diameters downstream (see Figure 6). Since there 

is flow in the DOWNSTREAM SENSE line, ½” tubing is 

recommended

NOTE: The control line connection should be 8-10 pipe 

diameters away from areas of turbulence (such as valves, 

reducers, and elbows) and should have a full opening into 

the pipe, free from burrs, drill peels, and weld slag. Shutoff 

valves are not required in the control line(s), but if installed, 

they should be of the full opening type. The control line 

connection should be in a section of pipe where the gas 

velocity is less than 100 ft/s (30 m/s) for stability.

12.  VENT VALVES AND GAUGE CONNECTIONS: 

Troubleshooting recommendation. To aid in maintenance 

and Troubleshooting, shut off and vent valves can be 

installed in tubing connections, and should be of the full 

open or ball style.

Maintenance

Pilot parts are subject to normal wear and must be inspected 

and replaced as necessary. The frequency of inspection and 

replacement of parts depends on severity of service conditions 

and/or the requirements of local, state, and federal regulations. 

Be certain that the name plates are updated to accurately 

indicate any field changes in equipment, materials, service 

conditions, or pressure settings.

NOTE: Before disassembly make sure the regulator and 

pilot have been isolated from the process by closing block 

valves on the inlet and outlet sides of the regulator. Safely 

release pressure and process fluid from the regulator body 

and pilot system. Failure to properly complete these steps 

may result in personal injury and property damage.

1. 

After depressurizing the pilot and main valve unscrew and 

remove Body Insert Assembly.

2. 

Remove the Stem O-Ring from the pilot body using a suitable 

tool and being careful not to scratch the O-Ring Groove.

NOTE: A spare Body Insert assembly may be installed and 

the regulator returned to service if time is a factor. Make 

sure the Stem O-Ring is in place in the Pilot Body before 

installing the new Body Insert Assembly or, if removed, slip 

a new O-Ring over the Stem of the Body Insert assembly 

prior to installing it in the Pilot Body.  Be sure to lube the 

new stem O-Ring prior to installation.

Pilot Disassembly - All Series 22 pilots

3. 

Remove the Bottom Cap from the Body Insert and remove 

the internal parts. The Orifice Assembly can be easily pushed 

out of the Body Insert using a heavy paper clip or 0.045” 

(1.14mm) diameter wire. See Figure 9.

NOTE: Do not scratch or damage the O-Ring sealing 

surface of the Body lnsert.

4. 

Inspect all parts for wear or damage. Replace as necessary. 

5. PILOT DIAPHRAGM:

 Release all Main Spring tension by 

unscrewing Adjusting Screw. Remove Closing Cap, Spring 

Follower, and Main Spring. Remove Spring Housing Cap 

Screws and remove Diaphragm Assembly & Disassemble 

Diaphragm Assembly and inspect Diaphragm. Replace if 

necessary.

Pilot Assembly - Series 22

1. 

Diaphragm Assembly: Install the Pilot Diaphragm with 

convex side toward Diaphragm Plate and Main Spring (Refer 

to Figure 9). Tighten nut on the Diaphragm Retainer to 

approximately 5 to 6 ft-lbs. (6.78 - 8.1 n-m) torque.

NOTE: Over-tightening will distort the Pilot Diaphragm

.

Figure 9 

- The orifice can be pushed out of the Body 

Insert (Cartridge) using a paper clip.

Spring
Nut
Diaphragm Plate

Diaphragm
Diaphragm Retainer

Figure 8

 - A paper clip, or pick  

easily extracts the O-Ring out of 

the pilot body.

Figure 10

 - Diaphragm Assembly for the 22 Series Pilot.

Summary of Contents for Mooney 22 Series

Page 1: ...Mooney 22 22H Series Pilots Instruction Manual Rev A Baker Hughes Data Classification Public...

Page 2: ...LAR REQUIREMENTS FOR OPERATION OF OTHER EQUIPMENT AT THE SITE THESE INSTRUCTIONS DO NOT PURPORT TO COVER ALL DETAILS OR VARIATIONS IN EQUIPMENT NOR TO PROVIDE FOR EVERY POSSIBLE CONTINGENCY TO BE MET...

Page 3: ...Table of Contents Product Description 4 General Description 5 Pilot Markings Figure 3 7 Series 22 Pilot Piping Schematics Loading Type Valves 8 Series 22 Pilot Loading Type Valve Installation 9 Maint...

Page 4: ...ax HP actuator in gas applications Series 22 Stainless steel construction with a 3 to 450 psig 0 2 barg 31 barg control pressure range Series 22H High pressure stainless steel construction with a 200...

Page 5: ...lnlet and Loading Ports 3 The INLET port is where upstream supply pressure is connected to the Series 22 Pilot Assembly The LOADING port is used to connect the controlling signal from the pilot to th...

Page 6: ...0 F 29 C to 66 C Emergency 40 F to 200 F 40 C to 93 C Maximum Inlet Pressure 1500 psig 100 barg Maximum Loading Pressure 1500 psig 100 barg Maximum Outlet Pressure 1500 psig 100 barg Maximum Emergency...

Page 7: ...5 Nameplate for Series 22 Pilots Figure 6 Spring Range Nameplate for Series 22H Pilots Table 4 Item Definition Mooney Pilot Trademarked name of pilot Series Model number of pilot Control Pressure The...

Page 8: ...tubing from filter OUTLET connection to the Series 22 pilot INLET port 2 Type 30 filter mounted in inlet piping 3 LOADING port of Series 22 pilot connected to Loading connection on the actuator housi...

Page 9: ...l sales representative for ordering information 1 PERSONNEL Installation of the Series 22 Pilot on the FlowMax Valve or any other manufacturer valve should be made by qualified personnel familiar with...

Page 10: ...fely release pressure and process fluid from the regulator body and pilot system Failure to properly complete these steps may result in personal injury and property damage 1 After depressurizing the p...

Page 11: ...t Body 4 Install Spring Housing Cap Screws Use cap screws supplied and tighten evenly to 8 ft lbs 10 8 Nm torque 5 Install Spring and Spring Follower Lubricate Spring Follower with a Petroleum Grease...

Page 12: ...bricate both Body Insert O Rings with Parker Super O Lube or equivalent Petroleum based Lubricant and install on Body Insert Cartridge 9 Body Insert Assembly Lift Bottom Cap complete with valve mechan...

Page 13: ...20 HP Diaphragm Assembly NOTE Over tightening will distort the Pilot Diaphragm 2 Place Diaphragm Assembly in the pilot body with the diaphragm touching the grooved sealing surface of the pilot body a...

Page 14: ...block after separation from the Series 22 block Figure 25 Restrictor Block Assembly The check valve can be removed from the Restrictor block while attached to the Series 22 block Care should be taken...

Page 15: ...Mooney 22 22H Pilots Instruction Manual 15 Copyright 2022 Baker Hughes Company All rights reserved Notes...

Page 16: ...com Copyright 2022 Baker Hughes Company All rights reserved Baker Hughes provides this information on an as is basis for general information purposes Baker Hughes does not make any representation as t...

Reviews: