All Right Reserved © SHENZHEN BAK POWER BATTERY CO., LTD
22
Integrated Lithium-ion Battery Pack
User Manual
3 INSTALLATION GUIDE
Table3-3 Electrical installation tools
The appearance of the tools, parameters, and names
Insulated gloves
Power cable
crimping plier
Wire stripping pliers Electrical tape
Table3-4 Measuring Tools
The appearance of the tools, parameters, and names
Current Clamp
meter
-
-
3.3
Installation and wiring
⚫
Before installing, make sure that the switching power supply system is off and
that the battery's system switch is off.
⚫
The installer should ensure that all wiring terminals have been wiped clean of dust.
After installation designate a person to check that all bolts have been correctly
tightened/torqued.
⚫
Check the battery voltage before installation and if required top-up charge the
battery before connecting it to the switching power supply and switching on the
mains.
At least two or more people should be present on the construction site.
3.3.1
Standard cabinet installation
Mounting fixed
The standard cabinet installation is to place the product on a shelf in a 19-inch
standard cabinet, then push it into the cabinet, and secure with m6*15 bolts
through the front panel mounting holes, into M6 cage nuts.