All Right Reserved © SHENZHEN BAK POWER BATTERY CO., LTD
21
Integrated Lithium-ion Battery Pack
User Manual
3 INSTALLATION GUIDE
accessories and order contracts should be recorded and immediately contact the
local branch or office of BAK company.
The site needs to be reviewed inspected once again to make sure the audit
documents are in order for the audit. Before inspection, the site should be clean.
3.2.2
Installation tools
Potential commonly used tools as shown in table 3-1~3-4.
Table3-1 General purpose tools
The appearance of the tools, parameters, and names
Adjustable
wrenches
Phillips screwdriver
Slotted screwdriver
Socket wrench
Torque wrench
Open-end
wrenches
Double offset ring
spanner
Diagonal cutting
pliers
Wire cutters
Needlenosed pliers
Marking pen
Working gloves
Ladder (2m)
Flashlight
Tape measure
Impact drill
Table3-2 Tools for delivery and unpacking
The appearance of the tools, parameters, and names
Manual forklifts
Electric forklift
Sling
(
weight≥
400kg
)
Leverage
(
weight≥400kg
)