![Bailey platinum standard PTSP Series Product Instruction Download Page 68](http://html1.mh-extra.com/html/bailey/platinum-standard-ptsp-series/platinum-standard-ptsp-series_product-instruction_467168068.webp)
REPAIR AND REPLACEMENT PROCEDURES
OPTIONAL EQUIPMENT REMOVAL AND INSTALLATION PROCEDURES
8 - 6
WBPEEUI110506A0
9. Coat the cell O-ring with a film of Dow Corning No. 4 com-
pound and install.
10. Perform Steps 3 through 11 in the
ization Board Assembly Installation
section.
11. Perform the calibration checks in
to verify the
calibration has not changed.
12. Install the transmitter on the process.
O-Ring Replacement
All O-ring replacement procedures are incorporated in the
steps for the replacement of various transmitter components.
OPTIONAL EQUIPMENT REMOVAL AND INSTALLATION PROCEDURES
Use Figures
as visual aids when performing these
procedures.
Indicator Removal
1. Remove the transmitter from the process.
2. Remove the left housing cover from the electronics housing
(Fig.
).
3. Remove the four screws that secure the indicator to the
amplifier assembly (Fig.
).
4. Gently pull on the indicator to unplug it from the amplifier
assembly.
5. Remove the housing cover O-ring.
Indicator Installation
1. Align the connector on the back of the indicator with one of
the four meter openings in the amplifier assembly (Fig.
The alignment of the connector depends on the desired viewing
orientation. Gently press the indicator down to seat the mating
connectors.
2. Install the four screws that secure the indicator to the
amplifier assembly.
3. Refer to
and identify the housing cover O-rings.
4. Coat the O-rings with a film of Dow Corning No. 4 com-
pound and install.
Summary of Contents for platinum standard PTSP Series
Page 1: ......