
14
14
9. With the tools installed, it is very important that the tool gap. Always set your tools with the
main crank hand wheel setting the top ram to the most downward movement. The gap
should be set to material thickness.
WARNING:
The tools on this machine should never come in contact with
each other, if they do, machine damage will occur.
Handwheel for
verifying tool gap
Summary of Contents for PH-19VS
Page 20: ...18 18 PARTS DIAGRAM Main Frame Assembly ...
Page 21: ...19 19 Back Stop Assembly ...
Page 22: ...20 20 Toggle Assembly ...
Page 23: ...21 21 Release Eccentric Assembly ...
Page 24: ...22 22 Crankshaft Assembly ...
Page 25: ...23 23 Release Pin Assembly ...
Page 26: ...24 24 Guard Assembly ...
Page 27: ...25 25 Single Phase Power System ...
Page 28: ...26 26 Three Phase Power System ...
Page 33: ...31 31 NOTES ...
Page 34: ...32 32 NOTES ...
Page 35: ...33 33 NOTES ...
Page 36: ...34 34 ...