![Badger Power Electronics BPE-HI-3.6K User Manual Download Page 15](http://html1.mh-extra.com/html/badger-power-electronics/bpe-hi-3-6k/bpe-hi-3-6k_user-manual_3385907015.webp)
5.7 System Work Mode Setup Menu
Lithium Mode
Shutdown
Low Batt
Restart
4
0%
30%
10%
00
Battery Setting
Set3
Batt
Grid Charge
Gen Charge
Grid Signal
Gen Signal
Gen Max Run Time
0.0 hours
Gen Down Time
0.5 hours
Battery Setting
s
Start
A
30%
30%
40A
40A
Batt
Set2
①
②
③
Battery Setup page.
Start - 30%
-
Don't use, Just for customisation.
A - 40A
-
Indicates the Current that the Grid
charges the Battery.
Grid Charge
-
Indicates the Switch that the Grid
charges the Battery.
Grid Signal
-
Disable.
Start
- 30% - Indicates that the Generator will start when
the Battery capacity is less than 30% in Off-grid mode.
A - 40A
- Indicates the Current that the Generator
charges the Battery after starting.
Gen Charge
-
Indicates the Switch that the Generator
charges the Battery.
Gen Signal
- Indicates whether the Generator's ATS
signal is on or off.
Gen Max Runtime
- Indicates the longest time the
Generator can run in one day, when the preset time is
up, the Generator will turn off. if you select 24h the
generator will not turn off.
Gen Down Time
- Indicates the time delay for the
Generator to shut down after it has reached the
preset running time.
①③
This is Grid Charge, you need to select.
②
There are 4 stages of charging the Battery .
①
This is for professional installers, this is only relevant if
you are not using a recommended Li-ion battery
storage system with compatible battery management
software (BMS)
Shutdown
-
The inverter will shutdown if the Voltage
is below this value.
Low Batt
- The inverter will alarm if the Voltage
falls below this value.
Restart
-
Restart level when the inverter
shutsdown.
③
Float V
55.2V
41.0V
45.0V
52.0V
-5
Absorption V
57.6V
Equalization V
58.8V
Equalization Days
Shutdown
Low Batt
Restart
TEMPCO(mV/C/Cell)
Batt Resistance
90 days
Equalization Hours
2.0
hours
25mOhms
Battery Setting
s
Set3
Batt
①
②
③
Time Of Use
Time
System Work Mode
Batt
~
~
~
~
~
~
Grid
Charge Gen
01:00
5:00
05:00
9:00
09:00
13:00
13:00
17:00
17:00
21:00
21:00
01:00
80%
80%
80%
80%
80%
80%
Work
Mode2
① ②
③
Time of use
②
③
①
Selection for Grid charging the battery.
Selection for Gen charging the battery.
There are six time periods that can be
set, each period must be higher than
the previous.
The Batt % indicates the SOC of the
battery before the Grid/Gen will start
to charge it.
- 23 -
- 24 -
Off-Grid Battery Setup
Lithium Mode
-
This is BMS protocol. Please reference
the document
(
Approved Battery-BPE
)
.
Shutdown 10%
-
Indicates the inverter will shutdown if
the SOC falls below this value.
Low Batt 20%
-
Indicates the inverter will sound
an alarm if the SOC falls below this value.
Restart 40%
-
Indicates the
SOC l
evel when the
battery
will restart to discharge
2
Export to Grid First
-
When the inverter is grid connected
any excess energy will be exported to the grid.
UPS Load Priority
- In this mode the inverter will
prioritise the U/EPS load. The output from the system will
attempt to match the U/EPS load using a combination of
the renewable energy generation and batt
ery
capacity,
by default this will also export zero to the grid, unless
"Solar Export" is ticked.
Consumption Priority
-
This mode will deliver the
renewable energy to the battery & building load, based
on the reading the inverter receives from the CT clamp.
By default this will also export zero to the grid, unless
‘Solar Export’ is ticked.
Max Sell Power -
The maximum wattage to export back
to the grid at any one time (watts).
Energy Pattern -
When a battery is connected the priority
will always be
Generation
>
Battery
>
Load
>
Export